Break‐Even Conditions for HTS‐HVDC in Constrained High‐Capacity Renewable‐Energy Transmission Corridors
Year: 2026
Type: article
Abstract: Constrained transmission corridors motivate comparison of high‐temperature superconducting high‐voltage direct‐current (HTS‐HVDC) with conventional VSC‐HVDC under a common receiving‐end service and contingency requirement. This study links three questions: how transmission ratings determine installed reserve, how much additional conventional corridor capital is required for parity and what conductor procurement price permits parity. The calculation purchases complete cable, converter and cooling inventories for independent modules and evaluates lifecycle expenditure and delivered energy. A 2‐GW conventional reference is compared with 2‐, 3‐, 4‐ and 5‐GW HTS planning modules using a common converter–cost relationship. At 2.1 GW receiving‐end power and 500 km, the additional conventional capital required for parity is approximately USD 0.80 billion for equal‐2‐GW modules and USD 1.39 billion for 5‐GW HTS modules. Fewer HTS assemblies can therefore coincide with a higher cost of installed reserve. Conductor‐price thresholds depend on that architecture and the assumed additional‐corridor capital; three heat‐ingress scenarios show their thermal sensitivity. Reliability and input uncertainty qualify these conditions rather than establish commercial feasibility. The calculations use published component correlations and explicit author cost and reliability scenarios. Historical project comparisons do not validate the conventional coefficients, and conductor‐current evidence does not qualify a complete 5‐GW cable system. The outputs are architecture‐specific conditions for further engineering and project appraisal, not estimates of demonstrated avoided corridor expenditure.
Source: Energy Science & Engineering
DOI: 10.1002/ese3.70701
Authors: Alireza Ganjovi(Conceptualization, Data curation, Formal analysis, Investigation, Methodology, Software, Validation, Visualization, Writing – original draft), Saman A. Gorji(Conceptualization, Funding acquisition, Investigation, Methodology, Project administration, Resources, Supervision, Visualization, Writing – review & editing)
Institution: Deakin University
Language: English
Subfield: Electrical and Electronic Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: gold
Estimated APC paid: $2,780
OpenAlex ID: W7233699521