Work

Bengal Fan Channel Transit: Travel Time, Discharge and Settling Selection Over Three Thousand Kilometres

Year: 2026
Type: article
Abstract: A sediment flow entering the Bengal Fan's active channel faces the longest gauged plumbing in the ocean: three thousand kilometres of channel at gradients below a tenth of a percent. At mean speeds near a metre per second the transit takes about a month, long enough for settling to edit the load profoundly en route. This budget prices the transit directly: travel time at the stated mean speed, discharge of the thick slow current, friction and settling numbers for silt, and the entrainment growth that a month of contact with seawater implies for the surviving flow. Headline values are bt30 runout distance km bt30 = 3000; bt30 grain diameter um bt30 = 30; bt30 flow density kg m3 bt30 = 1030; bt30 excess density kg m3 bt30 = 3.246; bt30 reduced gravity m s2 bt30 = 0.03091; bt30 gravity wave speed m s bt30 = 1.926. Discharge is printed beside travel time deliberately, because the pairing of slowness with enormity is the Bengal channel's signature.
Language: English
Open Access status: green
OpenAlex ID: W7233763862
FWCI:
Cites:
Cited by:
Related to: 10