Work

From Accurate Diagnosis to Operational Readiness: A Systematic Review and Predictive Maintenance Readiness Model for Renewable Energy Assets

Year: 2026
Type: article
Study design: Systematic Review
Abstract: Predictive maintenance (PdM) for renewable-energy assets has advanced rapidly, yet high diagnostic accuracy does not necessarily indicate operational readiness. This systematic review introduces an eight-dimension Predictive Maintenance Readiness Model (PMRM) to separate algorithmic performance from deployment maturity. Following PRISMA 2020, 1421 database records were identified; after removal of 471 duplicates, 950 records were screened, 545 reports were sought, 325 were assessed in full text, 220 reports were not retrieved, and 263 primary studies were included. PMRM scores data realism, validation rigor, robustness/generalization, prognostic or early-warning capability, explainability/trust, real-time deployment, maintenance-decision linkage and operational impact on a 0–2 scale (0–16 total). The mean PMRM score was 9.83/16 (95% CI 9.49–10.16); 82 studies (31.2%) were classified as High readiness, 139 (52.9%) as Moderate and 42 (16.0%) as Low. Validation rigor was near ceiling (mean 1.95/2), whereas operational impact was weakest (0.38/2), and only 14 studies (5.3%) reported measured operational outcomes at the highest level. Sensitivity analyses showed that the share of High readiness studies depends on the cutoff and weighting (20.0–45.0%), but the dimension profile was stable across all scenarios. Wind (n = 182) and PV/solar (n = 74) studies did not differ meaningfully in readiness (difference 0.20 points, 95% CI −0.53 to 0.94). Published renewable-energy PdM evidence therefore shows a persistent translation gap between accurate fault-diagnosis models and field-validated, explainable, decision-linked systems with measured operational value.
Source: Inventions
Language: English
Open Access status: gold
Estimated APC paid: $2,172
OpenAlex ID: W7233818531
FWCI:
Cites:
Cited by:
Related to: 10