Year: 2026
Type: article
Abstract: Bangladesh spends roughly Tk 37,000–38,500 crore a year through the Road Transport and Highways Division (RTHD), of which more than four-fifths is development spending. Independent assessments consistently place the unit cost of Bangladeshi highways far above regional comparators, while reports from the press, the Anti-Corruption Commission (ACC) and Transparency International Bangladesh (TIB) point to contractor concentration, weak supervision and premature deterioration. This case study examines the Roads and Highways Department (RHD) budget for FY2021-22 to FY2026-27, the contracting framework in force, and the evidence on quality and externalities. It finds that (i) unit costs are exceptionally high; (ii) maintenance is chronically under-funded and under-spent; (iii) contracts do contain defects-liability, retention and performance-security provisions, so the problem is their short duration and weak enforcement, not their absence; and (iv) no single consolidated SOP links design life, supervision, warranty and payment. The paper proposes a lifecycle-based SOP and discusses its implications for public financial management.
Author: Prof. Dr. A.B.M. Siddique
Language: English
Subfield: Strategy and Management
Domain: Social Sciences
Open Access status: diamond
OpenAlex ID: W7233840075
