Final Phase 2 Restoration Plan and Environmental Assessment #8.1: East Orleans Landbridge Restoration Project and Raccoon Island Restoration Project
Year: 2026
Type: article
Abstract: In 2022, the Louisiana Trustee Implementation Group3 (LA TIG) finalized Restoration Plan and Environmental Assessment #8: Wetlands, Coastal, and Nearshore Habitats (RP/EA #8), which screened project alternatives at the conceptual design stage based on geographic location, immediacy, and sustainability of project benefits provided for those that could best restore injured wetlands, coastal, and nearshore habitats (WCNH). Through that analysis, the LA TIG narrowed the range of alternatives to a suite of projects, including the East Orleans Landbridge Restoration Project and Raccoon Island Restoration Project. These two projects are proposed as “Phase 2” projects, as the engineering and design (E&D) phase (Phase 1) of the projects was funded through RP/EA #8.
Source: NOAA Institutional Repository
DOI: 10.25923/hv63-np89
Language: English
Subfield: Ecology
Field: Environmental Science
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W7233921634
