Is there enough electrical capacity to electrify heat in English acute hospitals? A national analysis of supply headroom using NHS estates data

Year: 2026
Type: preprint
Abstract: The NHS in England plans to replace fossil-fuel heating with heat pumps, but this will add a large winter load to hospital electrical supplies. This study uses 2025/26 Estates Returns Information Collection data to compare the maximum electrical demand and available supply capacity of 182 general acute hospital sites with the extra demand that full heat electrification would create. Median maximum demand was 66% of available capacity, and 66 sites had less than 500 kW of headroom. Under central assumptions, replacing boilers with heat pumps and retiring gas combined heat and power plant would add 540 MW of winter peak demand, almost twice the 292 MW of combined headroom, and 145 sites (79.7%) would exceed their current capacity. Across sensitivity cases the share ranged from 20%, with every assumption at its most favourable value, to 90%. Electrification would cut emissions from site heating and on-site generation by about 72%. Heat pump electricity would cost about the same as the gas burned today, but replacing electricity now generated by CHP would raise total energy spending by about 31%. Supply capacity should be assessed early in every hospital heat decarbonisation plan. Files: preprint manuscript (PDF); Supplementary Material S1, Python analysis and figure code (PDF); Supplementary Data S2, anonymised site-level results (XLSX). This is a preprint and has not been peer reviewed.
Author: Ali, Naushad
Language: English
Open Access status: green
OpenAlex ID: W7234024513
Cites:
Cited by:
Related to: 10