Work

At its deepest, the 12 August eclipse cost Spain about 4.2 GW of solar output

Year: 2026
Type: article
Abstract: Grid operators spent days bracing for the eclipse. It came, smaller and shorter than the biggest forecasts. Measured against clear days, Spain was down about 4.2 GW at the deepest point and Germany-Luxembourg about 1.9 GW. Most of it happened within a single hour of early evening. This record holds the technical note as a PDF and the summary tables behind its table and two figures: shortfall by zone and quarter-hour, peak shortfall and energy by zone, forecasts against outturn, daily solar energy and the clear days used for each baseline. The original article is at https://sdafintech.com/articles/2026/august-eclipse-solar-output. The full ENTSO-E series are not republished. Source data: ENTSO-E Transparency Platform (https://transparency.entsoe.eu/): actual generation per production type (solar, document A75) and day-ahead and intraday solar forecasts (A69), 2 to 22 August 2026. Modified: for each zone we built a clear-day baseline per quarter-hour, subtracted actual output and summarised the shortfall by zone, time slot and day. Retrieved 14 September 2026. Not endorsed by ENTSO-E. Authored by Sustainable Digital Assets Inc., the issuer of SDA Token. Informational; not investment advice.
Language: English
Field: Energy
Open Access status: green
OpenAlex ID: W7234199523
FWCI:
Cites:
Cited by:
Related to: 10