Work

A Digital Management Platform for Waterway Engineering Using Isolation Forest and Knowledge Graphs

Year: 2026
Type: article
Abstract: Waterway construction increasingly depends on digital management platforms, but these are typically assembled from independently procured systems with different standards and coding rules. The resulting silos, inconsistent definitions, and unreliable measurements limit what such platforms can deliver. This study developed a data-governance chain for harmonizing heterogeneous engineering data, implemented in a waterway platform in three stages: tandem data cleaning, combining rule-based screening with Isolation Forest; semantic integration of equivalent fields through three-level coding and a knowledge graph; and lakehouse-integrated tiered storage, supported by a Chief Data Officer role. The chain was evaluated in a single case, the Lianshen Waterway project, Jiangsu Province, China, through measured before-and-after indicators, an assessment by seven experts, and an ablation experiment. Retrieval time fell from 4 h to 1.4 h per batch; the tandem cleaning module reached an F1-score of 0.91 on the 500 labeled groups, against 0.74 for rule-based screening and 0.85 for Isolation Forest alone; and the field alignment reached a precision of 93.24% and a recall of 87.34% on 240 hand-labeled field pairs. The expert panel estimated a 60% reduction in data-management workload and a 25% gain in overall management efficiency, based on perceptions rather than measurements.
Source: Buildings
Language: English
Open Access status: gold
Estimated APC paid: $3,137
OpenAlex ID: W7234286126
FWCI:
Cites: 34
Cited by:
Related to: 10