How often do San Francisco building permits that add homes reach a final inspection? A held-out test of permit-stage completion forecasts

Year: 2026
Type: preprint
Abstract: Objective. Does a model that adds years open, size and permit type to a project's permit stage forecast housing completion better than a stage-only rate, and what share of units reach a final inspection? I set the shares beside San Francisco's Housing Element credits: 70% for approved projects that have filed for a building permit or await a first construction document, and 100% for projects authorized for construction (my reading of a 2018 Planning memo, not a City percentage). Data. DataSF building-permit records: projects with a unit-adding permit on file (Planning approval not checked), scored once under pre-registered rules on six held-out 1 January dates, 2017 to 2022. This is a retrospective test on today's records, not a real-time forecast. Findings. The model's Brier score was 10.1% lower than the stage rate (95% bootstrap interval 6.5% to 13.0%; coverage unverified, probably too narrow), lower on 6 of 6 dates. On a stricter outcome the gain is 5.4% (2.2% to 8.5%), inconclusive against the 5% margin, and 5.5% (-1.9% to 13.1%) over a stage-by-years-open average, so that edge is not established. Four of seven predictions held. Within 4 years, 11.1%, 23.3% and 68.5% of stage F, I and C units were in projects with a final inspection on a linked permit (capped at 200 units per project; uncapped 9.8%, 23.3%, 69.6%); within 8 years, 47.3%, 45.8% and 77.5% (stricter linking, uncapped; 49.7%, 47.0%, 79.5% with the 4-year test's linking): more than 10 points below the reference shares across the whole interval for F and C, inconclusive for I; the C reference is my own 100%, not a City figure. On the City's own measure for stage F (a permit issued within 8 years), the share was 62.7% (53.7% to 71.6%), which includes 70%. One permit's final does not show all counted units were built. The City's 70% is a permit-receipt rate, so this does not show the City overcounts; the 8-year plan's timing rests on my own record, not an independent timestamp. What is new. A held-out, stage-by-stage completion test with intervals for San Francisco; I found none earlier in a search. Use. A historical check for planners reviewing stage credits.
Author: Ling, Jayden
Language: English
Open Access status: green
OpenAlex ID: W7234311285
Cites:
Cited by:
Related to: 10