Work

Application of SIPOC and Resource Planning Systems to Reduce Demurrage Costs and Yard Saturation in Container Discharge Operations

Year: 2026
Type: article
Abstract: In high-volume manufacturing plants that rely on continuous imports of raw materials and components, inefficiencies in the container unloading process frequently generate yard congestion, delayed empty-container returns, and elevated demurrage and detention costs. Manual or semi-manual assignment procedures often result in duplicated container allocations, limited visibility of remaining free days, and suboptimal use of yard space and unloading equipment, ultimately affecting material availability and production continuity. This applied study proposes a low-cost solution that combines process diagnosis through the SIPOC methodology, a spreadsheet-based resource planning system, and a visual dashboard to optimize daily and weekly container unloading programs. The methodology is structured in five sequential phases: current-state diagnosis, resource and capacity evaluation, design of the planning system, development of the visual dashboard, and impact evaluation. The SIPOC analysis identified fragmented information flows and critical visibility gaps. A spreadsheet-based system incorporating structured tables, data validation rules, and macros was developed to register container data, unloading dates, warehouse destinations, and free-day status, while a dynamic dashboard provides real-time visibility of progress, warehouse distribution, and demurrage risk. Scenario analysis indicates that the proposed tools can significantly reduce the time required to generate the daily program, decrease assignment errors, and enable proactive prioritization of containers approaching their free-day limit. The findings demonstrate that the integrated use of high-level process mapping, structured resource planning, and visual management constitutes a practical and accessible intervention capable of reducing yard saturation and demurrage exposure without requiring a full enterprise resource planning system replacement. The approach offers a reproducible framework for improving inbound logistics performance in manufacturing environments characterized by high container volumes and constrained yard capacity. Operational validation through pilot implementation remains necessary to quantify actual cost and time savings.
Language: English
Open Access status: bronze
OpenAlex ID: W7234366632
FWCI:
Cites: 4
Cited by:
Related to: 10