Work

Congo Canyon Flushing: Sediment Flux, Bypass Efficiency and Export Past the Shelf Break

Year: 2026
Type: article
Abstract: The Congo River carries tens of millions of tonnes of sediment annually, and its canyon begins almost at the river mouth, so a large share of that load never settles on a shelf. Flood-triggered and tide-triggered flows flush the canyon repeatedly, and the longest events export sediment more than a thousand kilometres into the deep sea. Flushing is priced as a flux problem: discharge and sediment flux during a representative event, event export volume over a forty-hour flow, and comparison of that export with the river's mean annual load to obtain the number of events a year of river supply can sustain. Headline values are cf22 reynolds number cf22 = 2.381e+08; cf22 chezy speed m s cf22 = 2.633; cf22 back calculated drag cf22 = 0.001109; cf22 bed friction speed m s cf22 = 0.25; cf22 settling speed m s cf22 = 0.006108; cf22 rouse number cf22 = 0.05959. The travel entries matter because export only counts as bypass once the sediment clears the slope, three days downstream.
Language: English
Open Access status: green
OpenAlex ID: W7234548811
FWCI:
Cites:
Cited by:
Related to: 10