Multiobjective optimization model for project time and cost management under multiperiod financial constraints

Year: 2026
Type: article
Abstract: This study introduces a novel mathematical formulation for the multi-mode project scheduling problem that concurrently optimizes project duration and total direct cost under strict periodic budget constraints. To navigate the highly non-linear, combinatorial decision space inherent in this framework, a multi-objective evolutionary metaheuristic is developed to systematically map the non-dominated Pareto-optimal frontier. The practical efficacy and algorithmic accuracy of this proposed methodology are validated using an empirical case study centered on a flooring installation network within a large-scale government building infrastructure project. To establish a rigorous validation benchmark, the frontier solutions derived from the genetic metaheuristic were evaluated against an exact global optimization baseline generated via the GAMS (General Algebraic Modeling System). The multi-objective optimization model successfully identifies a robust baseline Pareto-optimal project duration of 64 working days. Comprehensive sensitivity analysis indicates that while an increase in capital allocation generally compresses project timelines by facilitating resource-intensive execution modes, this relationship is bound by distinct financial and physical plateaus. Additional schedule compression to 63 and 62 working days is conditionally achievable only when periodic financial boundaries are extended to their maximum upper limits. At this threshold, exact mathematical validation uncovers the absolute physical limit of the construction network, beyond which further budget injections yield diminishing returns regarding duration reduction. Crucially, the trade-off configurations generated by the non-dominated sorting genetic algorithm display a strong convergence profile, aligning closely with the global optima produced by the exact GAMS solver. This mathematical agreement demonstrates the performance, precision, and structural reliability of the calibrated metaheuristic when navigating complex project networks under multi-period financial constraints. Ultimately, this framework provides project managers and public procurement authorities with a highly practical decision-support tool capable of balancing tight delivery timelines and implementation expenditures within predefined, real-world fiscal boundaries.
Author: Nima Amani
Language: English
Open Access status: diamond
OpenAlex ID: W7234702623
FWCI:
Cites: 58
Cited by:
Related to: 10