Work

What Wide-Area Complementarity Can Actually Deliver: A Realization Ratio for Cross-Regional Renewable Integration

Year: 2026
Type: article
Abstract: Wide-area complementarity is widely invoked to justify long-distance interconnection, yet resource-correlation statistics do not reveal how much of that opportunity a power system converts into lower operating cost. We introduce the Complementarity Realization Ratio (CRR), which locates a network architecture between isolated operation (ISO) and a lossless copper plate (CU) by the share of the ISO–CU operating-cost opportunity it realizes. We solve four structurally nested architectures for each day of 2020–2022 in a four-region reduction of the Chinese system: ISO, rated corridors without the operational screen (RATED), rated corridors with a MISCR-inspired cross-regional injection screen (STRENGTH), and CU. Across 1096 days and 4384 MILPs, every architecture-day returns a feasible objective and valid dual bound. RATED and STRENGTH realize 0.3667 [95% CI 0.3344, 0.4117] and 0.3481 [0.3162, 0.3893] of the ISO–CU opportunity, respectively. The paired contrast separates the operating-cost effect of the screen from corridor capacity and converter losses. After national resource homogenization, CRR remains 0.3223 for RATED and 0.3147 for STRENGTH, showing that network feasibility and dispatch retain information beyond regional resource geography. Energy ledgers close below 2.658 × 10−6 MWh, and chronological and sub-hourly sensitivities test temporal robustness. CRR provides a reproducible diagnostic for translating resource complementarity into network-conditioned system value.
Language: English
Open Access status: gold
Estimated APC paid: $2,896
OpenAlex ID: W7235400689
FWCI:
Cites: 46
Cited by:
Related to: 10