Project Initiation Processes and Public Building Project Delivery in South-West Nigeria: A Cross-Sectional Study

Year: 2026
Type: article
Study design: Observational Study
Abstract: Public building projects in South-West Nigeria continue to encounter delays, cost pressure, quality concerns and abandonment, raising questions about the adequacy of project decisions made before execution. This study assessed the association between project initiation processes and public building project delivery. A cross-sectional survey targeted 402 building professionals drawn from a population of 480 across six South-West states. Of 402 questionnaires administered, 305 were retrieved (75.9%) and 300 were suitable for analysis (74.6% of those distributed). Descriptive statistics, multiple regression and seemingly unrelated regression (SUR) were used. Mean agreement scores were 4.262 for project charter development, 4.060 for stakeholder identification, 4.163 for feasibility studies and 4.210 for project team assembly; the initiation composite was 4.174 (SD = 0.735). The overall delivery regression was significant, F(4, 295) = 40.451, p < .001, R² = .354. In separate SUR equations, the initiation factors were jointly associated with cost (Wald χ² = 78.70), time (94.86) and quality (104.29), each p < .001. However, several individual coefficients were not significant, indicating that effects varied by outcome. Stronger initiation arrangements were associated with more favourable perceived building delivery, although the cross-sectional design does not establish causality. Public project sponsors should formalise project charters, stakeholder assessment, feasibility appraisal and team selection before authorising construction.
Language: English
Open Access status: bronze
OpenAlex ID: W7235710250
FWCI:
Cites: 5
Cited by:
Related to: 10