Work

Why Intact Schools Stay Empty: A Three-Gate Return Model from Suleja, Nigeria

Year: 2026
Type: article
Abstract: Why do schools whose buildings remain physically unscathed continue to sit closed for weeks after floods subside, even when patrols report calm conditions? This qualitative case study interrogates that paradox within Suleja LGA, Niger State – an annual flood hotspot and peri-urban corridor contiguous with the FCT. Based on four post-disaster school-resumption intervals along the Iku/Bakin-Iku corridor (2022-2024) and eight historical bulletins downstream of Shiroro Dam (2015-2023), it identifies governance-induced non-functionality: administratively viable classrooms remain closed 2-4 weeks due to procedural delays. The bottleneck is sustained by verbal clearance culture and mandate collision under asymmetric liability. The study proposes a Three-Gate Return Model (Building Integrity, Environmental & WASH Validation, Security Monitoring, Multi-Agency Execution) with a 72-hour written verification rule and joint evaluation window. Research Note (2026) – Derived from Master's fieldwork, University of Abuja SMIPLDS. Supplement to thesis DOI: 10.5281/zenodo.20416986
Language: English
Open Access status: green
OpenAlex ID: W7235744191
FWCI:
Cites:
Cited by:
Related to: 10