Mechanism of shallow hard-shell-layer formation for newly-reclaimed dredged silt using vacuum dewatering combined with preloading
Year: 2026
Type: article
Abstract: Newly-reclaimed dredged silt sites present a critical geotechnical challenge immediately after hydraulic filling. The ground surface remains as fluidized mud, preventing personnel and equipment access, yet conventional treatment methods assume the site is already accessible. This paper proposes a vacuum dewatering combined with preloading (VDCP) method for rapid formation of a shallow hard-shell layer without sand cushions or prolonged drying. A three-dimensional horizontal–vertical drainage network is established, coupling free-water extraction and negative-pressure consolidation. Physical model tests on Xiamen dredged silt (initial water content 281%) and Plaxis 2D numerical simulations are conducted to investigate the reinforcement mechanisms during the hard-shell formation stage. After 1,188 h of vacuum extraction, the average water content of the shallow soil decreases to 58%, the void ratio reduces from 7.53 to 1.49, and the ultimate bearing capacity increases from near zero to over 40 kPa, meeting the requirements for personnel and light machinery access. Numerical comparisons demonstrate that the three-dimensional drainage system achieves approximately 61.0% excess pore water pressure dissipation within 1,200 h, compared with 22.4% for horizontal-only and 18.3% for vertical-only drainage, confirming the synergistic effect of combined drainage channels, although these ratios are semi-quantitative. A consolidation coupling effect between vacuum and surcharge is observed; however, surcharge should be applied only after the soil has gained sufficient shear strength. The VDCP method and the proposed phased treatment framework, which designates shallow hard-shell formation as an independent preliminary stage with explicit transition criteria, provide a feasible technical pathway for similar projects that require priority construction of working platforms before deep reinforcement.
Source: Frontiers in Materials
Language: English
Subfield: Civil and Structural Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: gold
Estimated APC paid: $3,801
OpenAlex ID: W7236188717
