Project Schedule Optimization for Villa Development Using the Critical Path Method (CPM) and Line of Balance (LOB): A Case Study of the Indie Villa Development Project in Kuta

Year: 2026
Type: article
Abstract: Project scheduling is a critical factor in ensuring timely completion, efficient resource utilization, and effective control of construction projects. Villa construction projects often involve repetitive activities, where conventional scheduling methods may not adequately address workflow continuity and resource coordination. This study aims to optimize the construction schedule of the Indie Villa Project by integrating the Critical Path Method (CPM) and the Line of Balance (LOB). A quantitative descriptive approach was applied using primary data collected through interviews with the project manager, site engineer, and field supervisor, supported by secondary data including project schedules, work breakdown structures, and progress reports. CPM was employed to identify critical activities and determine the project critical path, while LOB was applied to analyze repetitive activities and optimize crew movement among villa units. Schedule optimization was achieved through activity overlapping, resource leveling, and selective crashing. The results show that the original project duration of 526 days was successfully reduced to 345 days, saving 181 days or 34.41% without changing the project scope. The integrated CPM–LOB approach improved workflow continuity, reduced idle time, optimized resource utilization, and enhanced schedule control, demonstrating its effectiveness for repetitive villa construction projects.
Language: English
Open Access status: diamond
OpenAlex ID: W7236242549
FWCI:
Cites: 14
Cited by:
Related to: 10