Work

The Hand on the Switch

Year: 2026
Type: article
Abstract: The largest outages of the past five years ran through the same few layers, and many broke when someone changed one. CRUCIBEL tested 977 significant outages worldwide from November 2021 to November 2026 for shared dependency, cascade, timing and common actor. On 13 November 2026 new routers installed during a copper-to-fiber conversion flooded the FAA's telecommunications network and the FAA ordered a nationwide ground stop. The same contractor's network failed during an upgrade in 2009. The paper sets out who controls the change on the FAA's network, the rules that already exist for airlines and the grid, and what must change. Live paper: https://crucibeljournal.com/the-hand-on-the-switch/
Author: Garner, Dino
Language: English
Open Access status: green
OpenAlex ID: W7236252566
FWCI:
Cites:
Cited by:
Related to: 10