Work

Economic evaluation of removing nautical bottlenecks on inland waterways: A Danube case study

Year: 2026
Type: article
Abstract: This paper synthesizes the findings of four preceding studies to derive system-level insights into the economic behavior of inland waterway infrastructure rehabilitation along the Danube. While the underlying methodological framework combines systematic literature review, expert validation, KPI-based modelling, transport simulation, and cost–benefit analysis (CBA), the present study focuses on integrating these individual results to identify consistent patterns that are hardly apparent from isolated analyses. The synthesis is based on a 1000 km Danube stretch comprising twelve nautical bottlenecks and approximately 6000 simulated transport voyages. The results show three key characteristics of bottleneck rehabilitation. First, economic benefits exhibit pronounced threshold effects, with isolated interventions generating only marginal or negative net present values (NPVs), while substantial benefits arise only after achieving sufficient corridor continuity. In the analyzed case, significant socio-economic gains are realized only when bottlenecks 4–12 are rehabilitated jointly, resulting in an NPV of approximately €248 million and a benefit–cost ratio (BCR) of 7.48. Second, the findings demonstrate strong sequencing effects, indicating that the order of rehabilitation substantially influences cumulative economic performance, with central bottlenecks contributing the highest marginal benefits. Third, the analysis identifies considerable spatial variability, as the economic relevance of individual bottlenecks depends on their network position and underlying transport conditions. The study concludes that the economic performance of inland waterway rehabilitation is governed by network-wide interactions rather than isolated project effects. By synthesizing previously separate analyses, the paper provides a system-oriented perspective that supports corridor-level investment prioritization and contributes to more effective planning of inland waterway infrastructure.
Language: English
Subfield: Transportation
Open Access status: gold
Estimated APC paid: $1,100
OpenAlex ID: W7236428464
FWCI:
Cites: 33
Cited by:
Related to: 10