Qualified Industrial Throughput Under Capital Expansion: Readiness Gates, Workforce Maturation, and Recovery Memory
Year: 2026
Type: preprint
Abstract: Capital authorization, installed production capacity, qualified process readiness, and customer-accepted output are distinct quantities. This manuscript formulates an evidence-typed production-network model that keeps them distinct while accounting for multi-stage yield, shared resources, delayed workforce qualification, and the persistence of unresolved interruptions. For a stationary serial route, accepted throughput is bounded by the minimum yield-corrected downstream capacity, conditional on mandatory release gates that take the values PASS, FAIL or UNKNOWN. A network formulation represents shared constraints without duplicating scarce resources; cohort convolution prevents hiring from being counted as immediately productive skill; and an age-structured interruption state separates unresolved events from observed lost output. Exact bounds and structural counterexamples are established, then a five-stage synthetic experiment is reconstructed over 52 weeks. Raising a nonbinding final-stage capacity yields zero additional accepted work, whereas a qualified inspection expansion adds 333.11 accepted equivalents and a coupled inspection-processing expansion adds 481.68. The analytic bound agrees with 250 independently solved random linear programs (maximum absolute difference 1.42 × 10−14); 2,500 paired perturbation draws quantify sensitivity under declared, non-empirical ranges. The contribution is the integration of established mathematical tools into a reproducible, prospectively falsifiable representation of industrial readiness, not a field-calibrated forecast or a new general optimization algorithm. All data are synthetic. Keywords: qualified throughput; manufacturing readiness; workforce maturation; multi-tier production; flow conservation; interruption memory; bottleneck migration; falsifiability. Proprietary components The analyses were produced by software held privately by the author. The code is not distributed with this record; its existence and exact content on the publication date are fixed by the SHA-256 fingerprints below. A fingerprint identifies a file but cannot be reversed into it. Reproduction engine for the five-stage, 52-week serial experiment, including gate timing and shock scenarios Independent linear-programming validation suite (250 randomized cases against the analytic bound; maximum difference 1.42 × 10−14) Paired perturbation sensitivity module (2,500 matched draws) and synthetic output series SHA-256 fingerprints: industrial_readiness_reproducibility.pyc70d1a4f0ca2008d807c94820af167da4e28e8b604762f4d1ec67c0b326d0cf8 industrial_readiness_synthetic_timeseries.csv4fd4f2549a90d21df16b137757602f9ff860bd3ad767ec006710788a2370ef20 industrial_readiness_sensitivity.csv9322035d91b2f1ef18d286dc5836b91c0a1c96295e5c9f9fc65864d4c6f751a1 Proprietary notice. The code is proprietary to Jarid Shaub. Licensed parties receive it with these fingerprints for independent verification. Commercial use, implementation, evaluation and licensing inquiries: [email protected]
Author: Shaub, Jarid
Language: English
Subfield: Strategy and Management
Domain: Social Sciences
Open Access status: green
OpenAlex ID: W7236694252