Work

Optimizing Facility Layout & Material Flow Logistics for Productivity Enhancement: A Systematic Engineering Approach

Year: 2026
Type: article
Abstract: Shorter material routes create an opportunity for productivity improvement, but output increases only when released time benefits a capacity constraint. This paper develops a deterministic bottleneck model for a xyz small-scale manufacturing unit using a fully disclosed synthetic dataset. Existing and improved layout scenarios share seven process areas, six workers, and an eight-hour paid shift. At a reference workload of 240 units, the associated route-and-time model releases 41.07 handling labour minutes per shift. The productivity model separately assumes that 35 min of bottleneck starvation are eliminated while intrinsic processing speed, staffing, and yield remain constant. Gross output consequently increases from 240 to 266 whole units per shift, a 10.83% gain. At a fixed 98% yield, expected acceptable output increases from 235.20 to 260.68 units, and paid labour productivity rises from 4.90 to 5.43 acceptable units per labour-hour. Sensitivity analysis shows that no output gain occurs when the recovered time fails to reach the bottleneck; demand and downstream capacity also cap the benefit. Higher output partially offsets the reduction in total daily transport. The study’s contribution is an explicit, auditable connection between layout-related handling savings and conditional throughput improvement. The findings are illustrative analytical results, not measured production
Language: English
Open Access status: hybrid
OpenAlex ID: W7236753462
FWCI:
Cites: 7
Cited by:
Related to: 10