The A.L.E.X. Methodology: A 3-Minute, Zero-Paperwork Pre-Task Safety Barrier for High-Risk Construction
Year: 2026
Type: article
Abstract: A.L.E.X. is a practical, field-engineered pre-shift operational risk management methodology designed for high-risk industrial and nuclear power plant (NPP) construction projects. Synthesizing international field engineering experience (Belarus, Bangladesh, Egypt) and Human and Organizational Performance (HOP) principles, the framework embeds four critical safety barriers—Altitude (A), Life-sparks (L), Extreme Danger (E), and X-Factor (X)—directly into standard pre-task briefing forms without generating additional paperwork. The methodology relies on a 2–3 minute physical walkthrough by line supervisors, personal quality checkmarks, and unconditional Stop-Work Authority ("Stop-Card").
Author: Lasko, Aleksandr I.
Language: English
Subfield: Safety Research
Field: Social Sciences
Domain: Social Sciences
Open Access status: green
OpenAlex ID: W7236791388
