Query-Cost-Aware Cooperative Restoration Scheduling for Interconnected Low-Voltage Distribution Areas
Year: 2026
Type: article
Abstract: Interconnected low-voltage distribution areas share flexible resources for post-fault service restoration. Acquiring current support information and confirming candidate schedules compete for communication resources. This paper proposes query-cost-aware cooperative restoration scheduling to coordinate neighbor queries and the timely activation of feasible restoration instructions. Shared soft-open-point transfers couple local three-phase dispatch, photovoltaic utilization, battery operation, and load service. Cached responses guide pre-query selection using predicted dual improvement per estimated communication cost. Permanent power-balance equalities provide numerically certified curvature bounds, while current endpoint responses determine the updates. Cooperative instructions are activated after fixed-transfer optimization, nonlinear three-phase four-wire power-flow validation, battery-energy validation, and joint confirmation. Across the main paired simulations, the capped mean time to reach 90% of the reference restoration increment decreases from 20.93 to 17.05 s relative to the Full neighborhood value baseline. In branch-isolation scenarios, 240 of 240 traces attain the target within 60 s, compared with 204 for the baseline. Full query with matched curvature also attains all targets, with a mean time of 17.08 s. These results support the timing improvement of the complete design.
Source: Energies
DOI: 10.3390/en19225608
Institution: State Grid Jiangsu Electric Power (China)
Language: English
Subfield: Electrical and Electronic Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: gold
Estimated APC paid: $3,137
OpenAlex ID: W7236795614
