Work

ARBOK-Lead-Water: Removing Lead at the Plant Outlet Instead of Digging Up Lead Service Lines

Year: 2026
Type: preprint
Abstract: Lead service lines still carry drinking water to homes in the old districts of many cities in the United States and Europe. Chicago alone has about 387,000 of them; the city code required lead service lines until 1986 [1]. Replacing a line costs about 20,000 USD and means excavation of the street, the yard and the wall, so the full Chicago program is estimated at 8 billion USD and more, and at the current pace would take 30-40 years. This paper describes ARBOK-Lead-Water, an application of ARBOK cold vacuum evaporation (Arbok-Evaporation) installed at the outlet of city treatment plants and at district delivery points. The unit separates the water from all dissolved metals, salts and organics, which stay in a dry residue, and delivers clean, chemically neutral water into the existing network. Energy use is 0.72 kWh per cubic meter, against 4-8 kWh/m3 for reverse osmosis, and no liquid brine is produced. Water with a neutral saturation index does not dissolve lead and gradually forms a thin carbonate-phosphate film on the pipe wall. For Chicago, the estimated capital cost is 2.5-3.0 billion USD against 8 billion USD and more for replacement. ARBOK-Lead-Water is at TRL 6, and the drinking-water lead case remains to be confirmed at a reference site.
Language: English
Open Access status: green
OpenAlex ID: W7236858987
Cites:
Cited by:
Related to: 10