An Outcome-Differentiated Assessment of Highway Contract Modifications: Occurrence, Financial Magnitude, and Materiality

Year: 2026
Type: preprint
Abstract: Highway contract-modification records capture administrative activity, positive monetary adjustments, and award-relative financial materiality, but these outcomes answer different engineering-management questions. We reconcile Kentucky Transportation Cabinet procurement and approved change-order records for 2,494 conventional highway contracts observed over the first 730 calendar days after letting. In contractor-clustered models, an award doubling is associated with higher odds of a positive-dollar order (odds ratio 1.381; 95% confidence interval 1.292–1.476). For the 835 contracts with positive additions, conditional gross positive dollars increase by a factor of 1.568 (1.445–1.702), consistent with sub proportional scaling. An award doubling shows no statistically clear association with positive signed-net changes above 5% of award (odds ratio 1.014; 0.929–1.107). Administrative orders occur on 1,726 contracts, versus positive-dollar orders on 835; gross-positive and signed-net 5% classifications differ for only five contracts. Nonlinear, program, and contractor-influence analyses qualify the pooled results. The framework supports separate reporting of ad-ministrative activity, conditional amounts, and positive net changes, not causal claims or validated cost forecasts. Monetary findings depend on source accounting definitions requiring authoritative verification.
Language: English
Open Access status: green
OpenAlex ID: W7236866099
Cites:
Cited by:
Related to: 10