Distributionally Robust Outsourcing for Parallel-Machine Scheduling Under Resource Asymmetry and Wasserstein Ambiguity
Year: 2026
Type: article
Abstract: Uncertain processing times complicate the allocation of production batches between internal machines and external manufacturers. Motivated by a display manufacturer in China, this study develops a Wasserstein distributionally robust model that jointly determines which batches to outsource and how to schedule the remaining batches on parallel machines. The model minimizes effective outsourcing costs and worst-case expected completion-time costs while limiting each machine’s overload probability and bounding the expected total outsourced workload. We derive an equivalent mixed-integer linear reformulation and develop a branch-and-Benders-cut algorithm. In the computational experiments, the proposed model yielded lower reported overload risk than deterministic optimization and sample-average approximation. In a separate out-of-sample evaluation, it reduced average cost by 6.08% relative to SAA and 13.35% relative to deterministic optimization. The algorithm also returned solutions sooner than the compact formulation on several larger instances. In the factory application, the average reported outsourcing-partner satisfaction rate was 94.74% over the observation period. These findings illustrate how the model can help manufacturers balance internal capacity protection with external workload requirements.
Source: Symmetry
DOI: 10.3390/sym18121961
Authors: Meiying Wu, Wenwen Han, Zhenjie Zou, Zhipeng Su
Institutions: Fujian Jiangxia University, Fuzhou University
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: gold
Estimated APC paid: $2,896
OpenAlex ID: W7238731870
FWCI:
Cites:
Cited by:
Related to:
