Effects of Right-of-Way Clearance on Cost and Schedule Performance of Road Construction Projects in Ethiopia: A Case Study of the Sodo–Tercha Road Project
Year: 2026
Type: preprint
Abstract: Right-of-way (ROW) clearance is a critical precondition for uninterrupted road construction, yet land acquisition, compensation, utility relocation, and site handover can delay project delivery. This study assessed the effects of ROW clearance on cost and schedule performance in the 75.72-km Sodo–Tercha Road Upgrading Project, Lot 1 (Sodo–Omo River section), Ethiopia. A mixed-methods case-study design integrated 84 structured questionnaires, 10 key-informant interviews, field observations, and project-document analysis. Quantitative responses were examined using descriptive statistics and the Relative Importance Index (RII), while interview evidence was thematically analyzed. Project records showed that the planned duration of 1,260 days increased to 2,067 days, a delay of 807 days (64.05%). Of the 807-day extension, 642 days were attributed to ROW-related obstructions, equivalent to approximately 79.6%. Utility relocation increased from 2 to 11 months, and compensation payment increased from 2 to 9 months. The contract sum rose from ETB 1,328,412,050 to ETB 1,383,400,809, representing a 4.14% increase; reported price-adjustment payments totaled ETB 129.79 million. Overhead costs (RII = 0.863), contractor claims (0.850), and idle labour/equipment (0.819) were the highest-ranked cost effects. Extension of time (0.975) and out-of-sequence work (0.913) dominated schedule effects. The findings demonstrate the importance of securing land and coordinating utility relocation before construction mobilization.
Source: Research Square
Author: Zenagebriel Gebremedhn
Institution: Mekelle University
Language: English
Field: Decision Sciences
Domain: Social Sciences
Open Access status: green
OpenAlex ID: W7238747487