Work

Spatiotemporal assessment of soil erosion in the Black Volta Basin using InVEST-SDR model: Implications for Bui hydropower generation

Year: 2026
Type: article
Abstract: Hydropower plants continue to face sediment-related impacts arising from soil erosion driven by anthropogenic and environmental factors, which can reduce reservoir storage capacity and create additional operational challenges. The 404 MW Bui Hydroelectric Plant is located within the Black Volta Basin (BVB), which is the largest principal basin of the Volta River. The basin is currently experiencing increasing anthropogenic pressures, including land-cover degradation, sand winning and illegal small-scale mining. In response, this study presents a spatiotemporal assessment of soil erosion in the BVB using the Integrated Valuation of Ecosystem Services and Tradeoffs-Sediment Delivery Ratio (InVEST-SDR) model. The findings indicate an increase in mean annual soil loss across the three assessment years, with estimates of 3.55 t/ha/yr in 2000, 5.77 t/ha/yr in 2015, and 6.58 t/ha/yr in 2025. “Very High” erosion risk zones (>50 t/ha/yr) have increased by approximately 242.95% between 2000 and 2025. Similarly, the basin’s mean annual sediment export rates are 0.82 t/ha/yr in 2000, 0.98 t/ha/yr in 2015, and 1.26 t/ha/yr in 2025. The surrounding catchments of the Bui Dam reservoir are currently experiencing high rates of erosion and sediment export, which, over time, could increase sediment accumulation in the reservoir and pose risks to its active storage capacity and operational efficiency. The study identifies hotspot catchments within BVB that should be prioritised for soil conservation-related intervention to minimise soil erosion.
Language: English
Subfield: Soil Science
Open Access status: gold
Estimated APC paid: $1,280
OpenAlex ID: W7238804599
FWCI:
Cites: 76
Cited by:
Related to: