The Hydraulic Response of a Roadside Drainage System to Urban Trail Encroachment: Integrated HEC-RAS, Culvert, and Erosion-Stability Assessment
Year: 2026
Type: article
Abstract: Urban trail construction can constrain existing roadside drainage corridors and alter water levels, flow velocity, culvert interaction, and erosion demand. This study evaluates a trail-constrained drainage retrofit in Moline, Illinois, USA, by linking changes in channel hydraulics to a proposed culvert-extension check and local lining demand. The study used StreamStats design hydrology, one-dimensional steady-flow HEC-RAS 6.5 outputs, HY-8 8.0.0 results, and HEC-15/IDOT riprap calculations. Existing and proposed conditions were compared at 24 matched HEC-RAS sections for the 10-, 25-, 50-, and 100-year events. Mean channel velocity decreased by 34.9–44.7%, while the median station-level water-surface-elevation (WSE) increase was 0.11–0.15 m; the corresponding mean WSE increase was 0.37–0.45 m because a small number of sections exhibited larger local changes. Velocity reductions were concentrated primarily within the reconstructed reaches, where mean reductions were about 54–56%; changes outside the reconstructed reaches were smaller and more variable. A targeted influence check excluding the anomalous downstream Station 2 found lower proposed-condition velocities at all 23 retained sections. A section-scale numerical sensitivity screening using plausible perturbations in roughness, discharge, and friction slope produced individual depth changes of less than 0.08 m at two representative reconstructed sections; a combined high-stage case increased depth by approximately 0.10–0.15 m without reversing the principal velocity-reduction pattern. The HY-8 calculation indicates that the proposed extension, 1.52 m in diameter, did not introduce an additional modeled restriction at the 100-year upstream design discharge of 5.89 m3/s, while the 10-year HEC-15 check showed that the lining satisfied the adopted stability criterion at all 13 evaluated design stations. Interpretation remains conditional because the higher-return-period StreamStats flows are extrapolated, field calibration data are unavailable, the stair-like energy-dissipation structure is not explicitly represented, and the terminal box culvert may influence the downstream-most hydraulic response. The case study therefore provides a conditional engineering comparison of channel, culvert-extension, and erosion-protection responses rather than a field-validated prediction of retrofit performance.
Source: Hydrology
Authors: Ahmad J. Alzubaidi(Conceptualization, Data curation, Formal analysis, Investigation, Methodology, Project administration, Resources, Software, Supervision, Validation, Visualization, Writing – original draft), Haneen H. Darwish(Conceptualization, Formal analysis, Investigation, Methodology, Resources, Validation, Writing – review & editing), Mutaz M. Zoubi(Conceptualization, Data curation, Formal analysis, Investigation, Methodology, Software, Supervision, Validation, Visualization, Writing – original draft), Mohammed N. Assaf(Conceptualization, Formal analysis, Investigation, Methodology, Software, Supervision, Writing – review & editing), Trung Do(Methodology, Supervision, Validation, Writing – review & editing), Nidal M. Hussein(Methodology, Supervision, Validation, Writing – review & editing)
Language: English
Subfield: Environmental Engineering
Field: Environmental Science
Domain: Physical Sciences
Open Access status: gold
Estimated APC paid: $2,172
OpenAlex ID: W7238811265