Complete Network Assessment of Road Disruption and Heuristic Pipe Sizing in a Mountainous Transport Hub
Year: 2026
Type: article
Abstract: Pipe enlargement can change hydraulic performance without producing a corresponding change in road availability. This study coupled a complete SWMM dual-drainage model of the Chongqing East Station area, containing 560 original stormwater pipes, with a physical-road graph of 577 nodes and 605 roads. For R50, R100 and R200 rainfall scenarios, the maximum numbers of roads closed at a 0.30 m mean-depth threshold were 13, 16 and 21, respectively. The corresponding blocked-road length–time losses were 0.3049, 0.3510 and 0.4105 km·h. Five successive R200 pipe-enlargement states were then compared with the baseline using a fixed score dominated by cumulative nodal overflow. All five states increased this score, so the baseline was retained. However, several enlargement states reduced road disruption; state 5 reduced length–time loss by 7.06% at the 0.30 m threshold. At a shallower 0.15 m threshold, some enlargement states increased road disruption. The three road-depth definitions also produced different cumulative losses, although no road in the three baseline cases exceeded 0.30 m at 360 min. These results show how the choice of evaluation measure can change the assessment of pipe enlargement and support considering road-network effects in drainage planning.
Source: Water
DOI: 10.3390/w18232925
Institutions: Chongqing University, Chongqing Jiaotong University
Language: English
Subfield: Environmental Engineering
Field: Environmental Science
Domain: Physical Sciences
Open Access status: gold
Estimated APC paid: $3,137
OpenAlex ID: W7238887355
FWCI:
Cites:
Cited by:
Related to:
