Schedule Risk Analysis and Recovery Planning for Large-Scale Entertainment Projects in Saudi Arabia

Year: 2026
Type: article
Abstract: Large entertainment developments combine conventional building works with specialist equipment, controls integration, commissioning and operator mobilisation. A schedule can show physical progress while the activities required for a safe opening fall behind. This paper develops a schedule risk and recovery framework for Saudi entertainment projects through a structured narrative synthesis of Saudi construction delay research, project scheduling literature and professional guidance. It links the contractual baseline to a logic driven current forecast, then connects risk drivers and opening dependencies to specific recovery decisions. An illustrative network compares a delayed forecast with procurement acceleration, site resequencing and coordinated recovery. The example shows how a supplier intervention can move the critical path to utility readiness and how a larger recovery package can improve the likelihood of a target while leaving substantial residual exposure. The proposed approach preserves commissioning and acceptance requirements, assigns accountability for cross package handovers and retains auditable programme versions. Its contribution is a decision sequence that connects construction progress, milestone risk and operational readiness in the same planning process.
Language: English
Open Access status: bronze
OpenAlex ID: W7239346336
FWCI:
Cites: 14
Cited by:
Related to: 10