From Risk Prediction to Decision Quality: AI-Driven Agile Sprint Planning Assessment under Capacity Uncertainty
Year: 2026
Type: article
Abstract: Sprint planning requires a choice between committing tasks and reserving capacity for work added during an iteration. We examined how added-task forecasts affect this decision using 238 Sprints from four public Jira projects: 129 for training, 37 for calibration, and 72 for later evaluation. For 38 eligible Sprints, we compared reservation policies through a common mixed-integer task-selection model under simulated workload and capacity shocks. Forecasting accuracy did not favor the more complex models: mean absolute error (MAE) was 5.853 for the seven-feature random forest (RF7), 4.556 for Lag-1, and 5.097 for the post hoc six-feature refit (RF6). At 50% simulated risk tolerance, the random-forest strategy had higher counterfactual proxy loss, calculated from closing-report task attributes, than fixed 20% reservation (7.079 versus 5.974; paired difference +1.105, exploratory 95% interval [0.553, 1.684]). Its simulated replanning incidence was lower in point estimate (39.47% versus 43.86%; difference −4.39 percentage points, 95% interval [−8.77, 0.00]), but the interval reached zero. The paired intervals for replanning and loss versus calibrated Lag-1 also crossed zero. The 38-Sprint comparisons and 54 sensitivity settings indicate a trade-off between simulated replanning incidence and schedulable proxy task value. Because the task pools and nominal capacities were derived from Sprint closing reports, these findings describe retrospective scenario comparisons rather than observed delivery outcomes.
DOI: 10.65455/18dg5h61
Author: Yushuai Cong
Institution: Belarusian State University
Language: English
Subfield: Information Systems
Field: Computer Science
Domain: Physical Sciences
Open Access status: hybrid
OpenAlex ID: W7239406428