BIM in Facility Management An assessment case study
Year: 2014
Type: dissertation
Abstract: A building is an enduring asset and the facility management phase is by far the longest during its life cycle. Thereof, the practice cannot succumb to all short-term trends, but requires long-term techniques and working methods, suitable to buildings of varying age and condition. One of the main problems facing the practice today involves the information handling. The information-handling problem manifests itself in various ways and results in unstructured building data, which considerably complicates the situation for its users. Building Information Modelling (BIM) offers a new approach to work with building information during the buildings whole life cycle. This report is a case study and the methodology used is strictly of qualitative nature.A comprehensive literature review in combination with empirical data collection in the form of interviews has provided the basis for the research. PrefaceThis Master of Science thesis is the final project in my postgraduate studies at the Department of Civil and Environmental Engineering at Chalmers University of Technology. It has been carried out at the municipal housing company Bostads AB Poseidon in Gothenburg Sweden during the spring of 2014. The study can be seen as a part of the company's effort of evaluating BIM as a viable aid to handle building information in the facility management phase. All interviews have been carried out at the interviewee's respective offices.I would like to thank everyone who has been involved, for their much-appreciated help throughout the project. Special thanks go to my university supervisor, Mattias Roupé and my Poseidon supervisor
Author: Gustav Eriksson
Institution: Chalmers University of Technology
Language: English
Subfield: Building and Construction
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W74943799
