Development of a two-step neural network-based model to predict construction cost contingency
Year: 2014
Type: article
Abstract: An owner’s cost contingency is one of the most important cost elements within a base estimate to account for unpredictable risks and changes in the delivery of construction projects. The accurate estimation of an optimal contingency is critical for the financial success of a project and for ensuring the optimal use of an owner’s funds. Existing methods for estimating contingency are deficient in that the answers they generate are often far from optimal causing problems such as depletion of budgets, disputes, and reduction in work quality. This study proposes a two-step neural network-based method for estimating the optimal contingency for an owner’s funding of transportation construction projects that has the objective of achieving solutions that are closer to the optimum than existing tools. The two-step method is a development of a one-step neural network approach that has been found to perform better than the approach currently adopted by the Florida Department of Transportation (FDOT). The two-step ANN-based prediction model is shown to generate estimates of contingency that are closer to the optimum than the one-step ANN-based approach. As a consequence, the two-step approach has the potential to improve an owner’s budgetary decisions, reducing the risk of either underutilizing or over committing funds.
Authors: Sang Choon Lhee, Ian Flood, Raja R. A. Issa
Language: English
Field: Decision Sciences
Domain: Social Sciences
Open Access status: diamond
OpenAlex ID: W77718374