Abstract: This paper traces the establishment of and describes the current characteristics of the Waste Experimental Reduction Facility, now processing low-level beta/gamma contaminated waste at the Idaho National Engineering Laboratory. It outlines principal findings and facility changes that occurred during the facility startup period (September 1982 to July 1983) while sizing (cutting) and melting uncontaminated metal in preparation for processing contaminated metal, which commenced in July 1983. It also briefly describes processing experiences thus far with contaminated metal.