Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Eric Low
Observed name:
E. Low
Institution:
Equinor (Norway)
Observed institution:
Equinor (Norway)
OpenAlex ID:
A5069729416
Highly Advanced Multitechnical MPD Concept Extends Achievable HPHT Targets in the North Sea
2008
·
Svein Syltøy
, Svein Erik Eide
, et al.
·
SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference and Exhibition
·
66
Feasibility Study of Managed-Pressure Drilling With Automatic Choke Control in Depleted HP/HT Field
2006
·
F. Iversen
, J. E. Gravdal
, et al.
·
SPE Annual Technical Conference and Exhibition
·
16
The Drilling and Testing of High-Pressure Gas Condensate Wells in the North Sea
1988
·
E. Low
, K. P. Seymour
·
SPE/IADC Drilling Conference
·
9
Improving Drilling Operations Efficiency on an Ultra-Narrow Margin HPHT MPD Well with use of a Mud Cap
2014
·
Joy Oyovwevotu
, Eric Low
, et al.
·
SPE/IADC Drilling Conference
·
2
Improving Drilling-Operations Efficiency on an Ultranarrow-Margin High-Pressure/High-Temperature Managed-Pressure-Drilling Well With Use of a Mud Cap
2014
·
Joy Oyovwevotu
, Eric Low
, et al.
·
SPE Drilling & Completion
·
1
Show more works
View as search
Works count:
5
Citation count:
94
H-index:
3
I10-index:
2
Year
Topic
Type