Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
David La Rosa
Observed name:
D. La Rosa
Observed institution:
Metso (Chile)
OpenAlex ID:
A5110667331
A correlation between Visiofroth(TM) measurements and the performance of a flotation cell
2007
·
Kym Runge
, J. McMaster
, et al.
·
26
The use of radio frequency ID tags to track ore in mining operations
2007
·
D. La Rosa
, W. Valery
, et al.
·
14
Fine grinding in the Australian mining industry
2003
·
A. Janković
, W. Valery
, et al.
·
13
Higher productivity through cooperative effort: a method of revealing and correcting hidden operating inefficiencies
2007
·
A. Dance
, W. Valery
, et al.
·
9
Integration and Optimisation of Blasting and Comminution Processes
2007
·
S. Esen
, D. La Rosa
, et al.
·
8
The development of an information management system for the improvement of drilling and blasting in mining operations
2020
·
David La Rosa
·
CRC Press eBooks
·
7
Throughput forecasting and optimisation at the Phu Kham copper-gold operation
2014
·
D. Bennet
, A. Tordoir
, et al.
·
6
Geometallurgical Modelling and Ore Tracking at Kittilä Mine
2018
·
D. La Rosa
, L. Rajavuori
, et al.
·
Springer eBooks
·
5
Batu Hijau model for throughput forecast, mining and milling optimization, and expansion studies
2006
·
Ben Burger
, Karen McCaffery
, et al.
·
5
Anglogold Ashanti Iduapriem mining and milling process integration and optimisation
2006
·
Deborah A. Renner
, D. La Rosa
, et al.
·
5
Blast fragmentation impacts on downstream processing at Goldfields Cerro Corona
2015
·
D. La Rosa
, K. Caron
, et al.
·
4
Kinross' Rio Paracatu Mineracao (RPM) mining and milling optimisation of the existing and new SAG mill circuit
2006
·
Luís Antônio Scalabrin Tondo
, W. Valery
, et al.
·
3
Maintaining the benefit - how to ensure mine to mill continues to work for you
2007
·
A. Dance
, W. Valery
, et al.
·
2
Mining and milling process integration and optimisation
2004
·
W. Valery
, D. La Rosa
, et al.
·
2
Process development and throughput forecasting at the Phu Kham copper-gold operation, Laos PDR
2017
·
D. Bennet
, I. Crnkovic
, et al.
GeoMetsoTM: a site-specific methodology to optimise production and efficiency over the Life-of-Mine
2013
·
W. Valery
, S. Lynch-Watson
, et al.
Smart ore tracking
2008
·
D. La Rosa
, W. Valery
, et al.
·
Mining magazine
Process integration and optimisation - A case study in productivity improvement
2007
·
A. Dance
, W. Valery
, et al.
Aplicação De Smartag Para Rastreamento De Minérios Da Mina À Usina
2007
·
Juliana Colacioppo
, Walter Valery
, et al.
·
ABM Proceedings
PDF
Engineering tools for the continuous improvement of drilling and blasting practices
2002
·
Italo Onederra
, D. La Rosa
Mining drilling and blasting practices submitted to Cerro Vanguardia
1999
·
G. P. Chitombo
, Italo Onederra
, et al.
Show more works
View as search
Works count:
21
Citation count:
109
H-index:
6
I10-index:
3
Year
Topic
Type