Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Horng‐Huei Wu
Observed names:
HORNG-HUEI WU,
Horng-Huei WU,
Horng-Huei Wu,
Hornghuei Wu,
Wu Horng Huei
Institution:
Chung Hua University
Observed institutions:
National Yang Ming Chiao Tung University,
Chung Hua University
OpenAlex ID:
A5111734798
A study of an enhanced simulation model for TOC supply chain replenishment system under capacity constraint
2010
·
Horng-Huei Wu
, Ching-Piao Chen
, et al.
·
Expert Systems with Applications
·
36
A two-level replenishment frequency model for TOC supply chain replenishment systems under capacity constraint
2014
·
Horng-Huei Wu
, Amy H.I. Lee
, et al.
·
Computers & Industrial Engineering
·
27
A research on problems of mixed-line production and the re-scheduling
2012
·
Hsiang-Hsi Huang
, Wen Pei
, et al.
·
Robotics and Computer-Integrated Manufacturing
·
23
Simulation and scheduling implementation study of TFT-LCD Cell plants using Drum–Buffer–Rope system
2010
·
Horng-Huei Wu
, Ching-Piao Chen
, et al.
·
Expert Systems with Applications
·
20
A study of supply chain replenishment system of theory of constraints for thin film transistor liquid crystal display (TFT-LCD) plants
2011
·
Wu Horng Huei
, Tsai Sheng Hung
, et al.
·
AFRICAN JOURNAL OF BUSINESS MANAGEMENT
·
10
PDF
Optimization of setup frequency for TOC supply chain replenishment system with capacity constraints
2013
·
Xiao-Yun Jiang
, Horng-Huei Wu
·
Neural Computing and Applications
·
9
A Study of Theory of Constraints Supply Chain Replenishment System
2013
·
Horng-Huei Wu
, Mao-Yuan Liao
, et al.
·
International Journal of Academic Research in Accounting Finance and Management Sciences
·
6
Diverse replenishment frequency model for TOC supply chain replenishment systems with capacity constraints
2013
·
Xiaoyun Jiang
, Hornghuei Wu
, et al.
·
International Journal of Modelling Identification and Control
·
6
Improved genetic algorithms for optimization of inventory allocation in LED chip manufacturing plants
2017
·
Horng-Huei Wu
, Xiao-Yun Jiang
·
Journal of Interdisciplinary Mathematics
·
5
A methodology for schedule compression
1996
·
HORNG-HUEI WU
, RONG-KWEI LI
·
Production Planning & Control
·
5
生產排程之重排程決策問題的文献探討舆分析
1997
·
Horng-Huei Wu
, Rong-Kwei Li
·
Journal of the Chinese Institute of Industrial Engineers
·
3
The Carbon Footprint Calculation Model of the Integrated ERP Framework – Green Production
2015
·
Horng‐Huei Wu
, Chih‐Hung Tsai
, et al.
·
2
An enhanced model for TOC Supply Chain Replenishment Systems under capacity constraint
2008
·
Horng-Huei Wu
, Tai-Ping Tsai
·
IEEE International Conference on Service Operations and Logistics, and Informatics (SOLI)
·
2
A replenishment model for VMI warehouse of LED-CM plants
2017
·
Lun-Meng Sun
, Horng-Huei Wu
, et al.
·
Pressacademia
·
1
PDF
Simulation and Implementation Study of Robust Drum-Buffer-Rope Management System to Improve Shop Performance
2011
·
Horng‐Huei Wu
, Ching‐Piao Chen
, et al.
·
1
限制驅導式管理系统於半導體封装廠之應用
1999
·
Horng-Huei Wu
, James T. Lin
, et al.
·
Journal of the Chinese Institute of Industrial Engineers
·
1
A Study of TOC Supply Chain Replenishment System in LED Chip Manufacturing Plant
2020
·
Horng-Huei Wu
, Liang-Ying Wei
, et al.
·
International Journal of Academic Research in Accounting Finance and Management Sciences
PDF
A Requirement-Dependent Inventory Allocation Model for Dynamic Allocation Process in LED Chip Manufacturing Plants
2016
·
Horng-Huei WU
, Chih-Hung TSAI
, et al.
·
International Journal of Academic Research in Accounting Finance and Management Sciences
PDF
Optimization of Setup Frequency for TOC Supply Chain Replenishment Systems Based on Pareto Particle Swarm Optimization
2013
·
Xiao-Yun Jiang
, Horng-Huei Wu
·
Journal of Networks
A study of the optimal competitiveness management model for the semiconductor manufacturing supply chain
2012
·
Horng-Huei Wu
·
AFRICAN JOURNAL OF BUSINESS MANAGEMENT
動態競爭應用於易經成卦決策 and Plan for Prolongation of Replenishment Frequency for TOC Supply Chain Replenishment Systems
2010
·
吳鴻輝
, Horng‐Huei Wu
Research on the Throughput Impact of the Strategic Stabilizing Capacity Constraint Resources by Prolonging Planning Period
2009
·
Horng‐Huei Wu
, Ching‐Piao Chen
, et al.
·
Asian Journal on Quality
A Design Model for the Protective Capacity of Serial Production Lines
2004
·
Horng-Huei Wu
, Wen-Fang Yan
·
Journal of the Chinese Institute of Industrial Engineers
瓶頸迴流前後作業之最佳作業間隔模式硏究
2000
·
Horng-Huei Wu
·
Journal of the Chinese Institute of Industrial Engineers
排程趕工績效之評估與趕工參數之控制方法
1999
·
Horng-Huei Wu
, Min-Ho Chiang
, et al.
·
Journal of the Chinese Institute of Industrial Engineers
Show more works
View as search
Works count:
25
Citation count:
157
H-index:
6
I10-index:
5
Year
Topic
Type