Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Xing Bi
Observed names:
Bi Xing,
Xing BI
Institution:
Tianjin University
Observed institution:
Tianjin University
OpenAlex ID:
A5111992030
Factors influencing the application of prefabricated construction in China: From perspectives of technology promotion and cleaner production
2019
·
Guobin Wu
, Ru Yang
, et al.
·
Journal of Cleaner Production
·
214
Application of Fuzzy Analytical Hierarchy Process in Selecting a Project Manager
2006
·
Bi Xing
, Zhang A-di
·
International Conference on Management Science and Engineering (ICMSE)
·
21
Research on the Integration of Lean Construction and BIM and a Case Study in Shanghai Tower Project
2015
·
Xing Bi
, Xi-mu Jia
·
Atlantis Press eBooks
·
8
Study on Agile Software Development Based on Scrum Method
2019
·
Er-shi Qi
, Hai-tian Bi
, et al.
·
Springer eBooks
·
6
The study on risk assessment of EPC contractor based on fuzzy analytic hierarchy process
2010
·
Xing Bi
, Hai-tao Tan
·
Industrial Engineering and Engineering Management
·
6
Optimization on Earned Value Method Combined with Critical Path
2013
·
Qi-bin Zheng
, Xing Bi
·
Springer eBooks
·
5
Supply Chain Finance Credit Risk Evaluation Based on Trapezoid Fuzzy Number
2013
·
Xing Bi
, Xin Dong
, et al.
·
Springer eBooks
·
5
The control of moral hazard in PPP project renegotiation
2011
·
Xing Bi
, Hong Wang
·
Industrial Engineering and Engineering Management
·
4
Application of fuzzy comprehensive evaluation method based on entropy to evaluation risk of an EPC project
2011
·
Xing Bi
, Guo-liang Wang
·
Industrial Engineering and Engineering Management
·
3
Application of System Dynamics in Construction Project Management
2004
·
Xing Bi
·
Harbin Ligong Daxue xuebao
·
3
Evaluation of Wastewater Treatment Quality in the West Bank-Palestine Based on Fuzzy Comprehensive Evaluation Method
2015
·
Xing Bi
, Rabah A. M. Isaili
, et al.
·
IEEE International Conference on Industrial Engineering and Engineering Management
·
2
The evaluation of customer potential value based on prediction and cluster analysis
2010
·
Bi Xing
, Wang Xin-feng
·
International Conference on Management Science and Engineering (ICMSE)
·
2
The application of improved BP algorithm in customer classification of life insurance
2009
·
Xing Bi
, Jian Li
, et al.
·
International Conference on Management Science and Engineering (ICMSE)
·
2
Sustainability Assessment System of Engineering Project
2008
·
Xing Bi
·
Journal of Tianjin University Science and Technology
·
2
A Study on Construction Project Cost Management Based on Neural Network
2019
·
Jin-song Tong
, Xing Bi
·
Springer eBooks
·
1
A New Algorithm for the Risk of Project Time Based on Monte Carlo Simulation
2015
·
Xing Bi
, Zhiyuan Chen
, et al.
·
IEEE International Conference on Industrial Engineering and Engineering Management
·
1
Investment Risk Analysis of Gas and Pipeline Construction Project Based on the Gray Analytic Hierarchy Process
2015
·
Lin-lin Mu
, Xing Bi
·
IEEE International Conference on Industrial Engineering and Engineering Management
·
1
The Application of the Entire Human Resources Crisis Management Model in E-Commerce Company: Make Example of AZ Company
2013
·
Xing Bi
, Ying Liu
·
Springer eBooks
·
1
The Role Analysis for the Shareholding Structure to Risk Control in Public–Private Partnerships
2013
·
Xing Bi
, Jing-xing Chang
·
Springer eBooks
·
1
Research on EPCM project procurement risk based on TOPSIS and RBF method
2011
·
Xing Bi
, Liang Xie
, et al.
·
Industrial Engineering and Engineering Management
·
1
Study on the Exchange Rate Risk of China International Construction Enterprises
2016
·
Quan Fan
, Xing Bi
·
Atlantis Press eBooks
Risk Analysis for Chinese CDM Projects Seller Enterprises Based on Multi-step Fuzzy Comprehensive Evaluation
2015
·
Xing Bi
, Chi Wang
·
IEEE International Conference on Industrial Engineering and Engineering Management
The Distribution of Residual Control Rights Under Self-interest Behaviour
2015
·
Xing BI
, Jin DONG
·
IEEE International Conference on Industrial Engineering and Engineering Management
The Feasibility of Amended Creditmetrics Model’s Application of Commercial Bank in China
2013
·
Xing Bi
, Feng Xue
·
Springer eBooks
Research on the Selection of Construction Supplier in the Construction Supply Chain Environment
2013
·
Wei-yan Xie
, Xing Bi
·
Springer eBooks
Show more works
View as search
Works count:
32
Citation count:
289
H-index:
5
I10-index:
2
Year
Topic
Type