Product
Help
Pricing
About
Jobs
Log in
Get started
Keyword
Add to collection
crashing
Description:
The meaning is unclear from the titles, which use the term across unrelated contexts and do not establish a specific concept.
Primary topic:
Resource-Constrained Project Scheduling (75%)
Related topics:
Resource-Constrained Project Scheduling (75%),
Construction Project Management and Performance (13%)
OpenAlex ID:
keywords/crashing
A Network Flow Computation for Project Cost Curves
1961
·
D. R. Fulkerson
·
Management Science
·
416
Advanced Project Management: A Structured Approach
2017
·
Frederick Harrison
, Dennis Lock
·
Routledge eBooks
·
233
Concurrent Crashing and Overlapping in Product Development
2004
·
Thomas A. Roemer
, Reza Ahmadi
·
Operations Research
·
144
A Structural Method of Computing Project Cost Polygons
1963
·
William Prager
·
Management Science
·
79
Time‐Cost Trade‐Off Among Related Activities
1989
·
Rehab Reda
, Robert I. Carr
·
Journal of Construction Engineering and Management
·
60
ANALISIS PERCEPATAN PELAKSANAAN DENGAN MENAMBAH JAM KERJA OPTIMUM PADA PROYEK KONSTRUKSI (Studi Kasus: Proyek Pembangunan Super Villa, Peti Tenget-Badung)
2010
·
Ariany Frederika
·
50
Evaluasi Proyek Pembangunan Gedung Stroke Center (Paviliun Flamboyan) Menggunakan Metode Critical Path Method (CPM) Dan Crashing
2022
·
Nihayatus Sa'adah
, Evany Iqrammah
, et al.
·
Publikasi Riset Orientasi Teknik Sipil (Proteksi)
·
36
PDF
Interdiction Games on Markovian PERT Networks
2014
·
Eli Gutin
, Daniel Kuhn
, et al.
·
Management Science
·
36
Aplikasi Microsoft Project Dalam Pengendalian Waktu Pelaksanaan Pekerjaan Proyek
2013
·
Fransisko Noktavian Wowor
, Bonny F. Sompie
, et al.
·
JURNAL SIPIL STATIK
·
32
Bayesian Point Estimation and the PERT Scheduling of Stochastic Activities
1976
·
Robert R. Britney
·
Management Science
·
32
A heuristic method to determine optimum degree of activity accelerating and overlapping in schedule compression
2013
·
Kamran Hazini
, Reza Dehghan
, et al.
·
Canadian Journal of Civil Engineering
·
26
Optimizing time–cost trade-offs in product development projects with a multi-objective evolutionary algorithm
2016
·
Christoph Meier
, Ali A. Yassine
, et al.
·
Research in Engineering Design
·
23
Penerapan Metode Jalur Kritis Dalam Penyusunan Jadwal Pelaksanaan Proyek Pembangunan Fasilitas Rumah Karyawan
2015
·
Elfitria Wiratmani
·
Faktor Exacta
·
23
Analisis Percepatan Waktu Penyelesaian Proyek Dengan Metode Crashing Dan Fast Tracking Pada Pelebaran Jalan Dan Jembatan
2019
·
Bambang Dwi Wijanarko
, Wateno Oetomo
·
22
Analisis Percepatan Proyek Menggunakan Metode Time Cost Trade Off Dengan Penambahan Jam Kerja Lembur Dan Jumlah Alat
2017
·
Rizky Widyo Kisworo
, Fajar Sri Handayani
, et al.
·
Matriks Teknik Sipil
·
22
Analisis Kinerja Biaya Dan Waktu Menggunakan Metode Earned Value Pada Proyek Pembangunan Infrastruktur Laboratorium Tradisional Food Gmp Facility (paket 3)
2021
·
R. Muchammad Bagas Wicaksono
·
Akselerasi Jurnal Ilmiah Teknik Sipil
·
21
PDF
Optimasi Waktu dan Biaya pada Pelaksanaan Proyek Peningkatan Jalan Bina Bakti Kelurahan Gunung Seteleng Kabupaten Penajam Paser Utara dengan Metode Time Cost Trade Off (TCTO)
2020
·
Irna Hendriyani
, Reno Pratiwi
, et al.
·
Jurnal Ilmiah Teknik Sipil TRANSUKMA
·
20
PDF
PERENCANAAN DAN PENGENDALIAN JADWAL DENGAN MENGGUNAKAN PROGRAM MICROSOFT PROJECT 2010 (Studi Kasus: Proyek PT. Trakindo Utama)
2012
·
David M. Walean
, Robert J. M. Mandagi
, et al.
·
JURNAL SIPIL STATIK
·
20
Automated Components–Vehicle Allocation Planning for Precast Concrete Projects
2022
·
Jun Young Jang
, Jung In Kim
, et al.
·
Journal of Management in Engineering
·
18
Robust Capacity Planning for Project Management
2021
·
Antonio J. Conejo
, Nicholas G. Hall
, et al.
·
INFORMS journal on computing
·
18
After the Century of Strangers: Hospitality and Crashing in Zadie Smith’sWhite Teeth
2015
·
RYAN TRIMM
·
Contemporary Literature
·
18
Analisis Percepatan Waktu Dengan Metode Fast Track Dan Crashing Pada Proyek Pt Graynenda Putra Karya
2022
·
Aminatuz Zuhriyah
, Wateno Oetomo
·
Jurnal Kacapuri Jurnal Keilmuan Teknik Sipil
·
16
PDF
Corrosion–erosion wear of N80 carbon steel and 316L stainless steel in saline–quartz slurry
2011
·
H. Li
, Y. H. Liu
, et al.
·
Materials and Corrosion
·
16
Analisis Percepatan Proyek Menggunakan Metode Fast Track dan Metode Crashing Pada Proyek Pembangunan Gedung Bertingkat
2023
·
Zahra Ramadhani Wardana
, I Nyoman Dita Pahang Putra
·
CIVED
·
13
PDF
A crashing-based time-cost trade-off model considering quality cost and contract clauses
2021
·
Firat Dogu Akin
, Gul Polat
, et al.
·
International Journal of Construction Management
·
13
Show more works
View as search
Works count:
319
Citation count:
1,837
Year
Topic
Type