Product
Help
Pricing
About
Jobs
Log in
Get started
Keyword
Add to collection
delay analysis
Description:
The study or estimation of time delays in processes and systems, including communication networks, manufacturing, maintenance, and construction.
Related topics:
Wireless Networks and Protocols (11%),
Construction Project Management and Performance (10%),
Network Traffic and Congestion Control (8%),
Low-power high-performance VLSI design (7%)
OpenAlex ID:
keywords/delay-analysis
Critical-Path Planning and Scheduling: Mathematical Basis
1961
·
James E. Kelley
·
Operations Research
·
1,023
Tree algorithms for packet broadcast channels
1979
·
J. Capetanakis
·
IEEE Transactions on Information Theory
·
987
Narrow Band Internet of Things
2017
·
Min Chen
, Yiming Miao
, et al.
·
IEEE Access
·
529
MultiNet: connecting to multiple IEEE 802.11 networks using a single wireless card
2004
·
Ranveer Chandra
, Paramvir Bahl
, et al.
·
IEEE Conference on Computer Communications (INFOCOM)
·
447
A new approach to channel access scheduling for Ad Hoc networks
2001
·
Lichun Bao
, J. J. Garcia-Luna-Aceves
·
ACM Annual International Conference on Mobile Computing and Networking (MobiCom)
·
392
InAlN/AlN/GaN HEMTs With Regrown Ohmic Contacts and $f_{T}$ of 370 GHz
2012
·
Yuanzheng Yue
, Zongyang Hu
, et al.
·
IEEE Electron Device Letters
·
388
The use of Bayesian network modelling for maintenance planning in a manufacturing industry
2009
·
B. Jones
, I. Jenkinson
, et al.
·
Reliability Engineering & System Safety
·
357
Clustering-Based Multichannel MAC Protocols for QoS Provisionings Over Vehicular Ad Hoc Networks
2007
·
Hang Su
, Xi Zhang
·
IEEE Transactions on Vehicular Technology
·
353
Analysis on Cache-Enabled Wireless Heterogeneous Networks
2015
·
Chenchen Yang
, Yao Yao
, et al.
·
IEEE Transactions on Wireless Communications
·
335
PDF
Stability and Delay of Finite-User Slotted ALOHA With Multipacket Reception
2005
·
V. Naware
, G. Mergen
, et al.
·
IEEE Transactions on Information Theory
·
320
Remarks on IEEE 802.11 DCF performance analysis
2005
·
G. Bianchi
, I. Tinnirello
·
IEEE Communications Letters
·
296
Aloha with preamble sampling for sporadic traffic in ad hoc wireless sensor networks
2003
·
A. El-Hoiydi
·
International Conference on Communications
·
283
Delay analysis of IEEE 802.11 in single-hop networks
2003
·
M.M. Carvalho
, J.J. Garcia-Luna-Aceves
·
IEEE International Conference on Network Protocols (ICNP)
·
268
Heterogeneous Cellular Networks With Spatio-Temporal Traffic: Delay Analysis and Scheduling
2017
·
Yi Zhong
, Tony Q. S. Quek
, et al.
·
IEEE Journal on Selected Areas in Communications
·
246
PDF
Channel-hopping multiple access
2002
·
A. Tzamaloukas
, J.J. Garcia-Luna-Aceves
·
International Conference on Communications
·
210
Delay Time Models of Industrial Inspection Maintenance Problems
1984
·
A. H. Christer
, W. M. Waller
·
Journal of the Operational Research Society
·
207
Determining end-to-end delay bounds in heterogeneous networks
1997
·
Pawan Goyal
, Simon S. Lam
, et al.
·
Multimedia Systems
·
205
Delay and Capacity Tradeoff Analysis for MotionCast
2011
·
Xinbing Wang
, Wentao Huang
, et al.
·
IEEE/ACM Transactions on Networking
·
204
Analyzing and estimating delays in wood chipping operations
2008
·
Raffaele Spinelli
, Rien J.M. Visser
·
Biomass and Bioenergy
·
204
A receiver-initiated collision-avoidance protocol for multi-channel networks
2002
·
A. Tzamaloukas
, J.J. Garcia-Luna-Aceves
·
IEEE Conference on Computer Communications (INFOCOM)
·
204
Multichannel Local Area Network Protocols
1983
·
M.A. Marsan
, D. Roffinella
·
IEEE Journal on Selected Areas in Communications
·
191
UWB on-body radio propagation and system modelling for wireless body-centric networks
2006
·
A. Alomainy
, Y. Hao
, et al.
·
IEE Proceedings - Communications
·
190
Developments in Delay Time Analysis for Modelling Plant Maintenance
1999
·
A H Christer
·
Journal of the Operational Research Society
·
176
Spectrum Aware Routing for Multi-Hop Cognitive Radio Networks with a Single Transceiver
2008
·
Huisheng Ma
, Lili Zheng
, et al.
·
International Conference on Cognitive Radio Oriented Wireless Networks and Communications
·
168
Reducing Production Downtime Using Delay-Time Analysis
1984
·
A. H. Christer
, W. M. Waller
·
Journal of the Operational Research Society
·
164
Show more works
View as search
Works count:
2,384
Citation count:
25,090
Year
Topic
Type