Product
Help
Pricing
About
Jobs
Log in
Get started
Keyword
Add to collection
installation time reduction
Description:
Methods or design changes intended to shorten the time required to install equipment, systems, or construction components.
Related topics:
Offshore Engineering and Technologies (9%),
BIM and Construction Integration (7%)
OpenAlex ID:
keywords/installation-time-reduction
Cable-driven parallel robot for curtain wall module installation
2022
·
K. Iturralde
, M. Feucht
, et al.
·
Automation in Construction
·
114
The deployable element, a new closure joint construction method for immersed tunnel
2018
·
Ming Lin
, Wei Lin
, et al.
·
Tunnelling and Underground Space Technology
·
66
Collaborative Production Line Planning with Augmented Fabrication
2018
·
Doris Aschenbrenner
, Meng Li
, et al.
·
IEEE Conference on Virtual Reality and 3D User Interfaces (VR)
·
16
Cable joint installation time optimization
2017
·
Subhankar Das
, Rajdeep Majumder
, et al.
·
IEEE Transactions on Dielectrics and Electrical Insulation
·
16
The “D2P” Approach: Digitalisation, Production and Performance in the Standardised Sustainable Deep Renovation of Buildings
2022
·
Fabrizio Cumo
, Federica Giustini
, et al.
·
Energies
·
15
PDF
World's First Mass Implementation of Ultra-High-Speed ESP Systems in Salym Group of Fields, Western Siberia, Russia
2019
·
Anton Shakirov
, Yaroslav Alexeev
, et al.
·
SPE Gulf Coast Section Electric Submersible Pumps Symposium
·
14
Design and development of an F/A-18 inlet distortion rake - A cost and time saving solution
1994
·
Ray, Ronald J.
, Burley, Richard R.
, et al.
·
AIAA Flight Test Conference
·
14
PDF
Float-Overs Offshore West Africa
2007
·
C. Tribout
, D. Emery
, et al.
·
Offshore Technology Conference
·
13
Enhanced robotic cross-laminated timber panel assembly process
2025
·
Eric Forcael
, Ramón Mata
, et al.
·
Developments in the Built Environment
·
12
Matching kit interface for building refurbishment processes with 2D modules
2019
·
K. Iturralde
, T. Linner
, et al.
·
Automation in Construction
·
12
Conductor Sharing Wellheads - More For Less
2001
·
L. Anchaboh
, F. P. A. de Lange
, et al.
·
SPE Asia Pacific Oil and Gas Conference and Exhibition
·
11
The SOM-TSP method for the three-dimension city location problem
2002
·
S. Takahashi
, K. Fujimura
, et al.
·
International Conference on Neural Information Processing
·
10
New Design for Installation (dfi) Methodology for Large Size and Long Life Cycle Products: Application to an Elevator
2021
·
Iban Retolaza
, Izaro Zulaika
, et al.
·
Proceedings of the Design Society
·
7
PDF
Applications of template A3 and value-stream mapping in process improvement: the case of building elevators installation
2021
·
Gino Flávio Vieira
, James Manoel Guimarães Weiss
·
Gestão & Produção
·
7
PDF
Design Predictions and Measurements During Installation of Suction Anchors With and Without Water-Flow System to Help Installation Through Layered Soil Profiles
2009
·
Per Magne Aas
, Morten Saue
, et al.
·
Offshore Technology Conference
·
7
On-Site versus In-Factory Installation of Solar-Plus-Storage in Modular Construction
2023
·
Ondrej Labik
, Isabelina Nahmens
, et al.
·
Journal of Construction Engineering and Management
·
6
Selection of membranes and linking method in slope stabilization systems for the reduction on the installation time using multi-criteria decision analysis
2021
·
Laura Castanon-Jano
, Daniel Castro-Fresno
, et al.
·
Ain Shams Engineering Journal
·
6
PDF
Automotive Enterprises Flow Production Improvement Based on the Management Process Intellectualization
2018
·
Irina Makarova
, Polina Buyvol
, et al.
·
World Symposium on Digital Intelligence for Systems and Machines (DISA)
·
6
Vorteile eines modularen Konzeptes bei der Anschaffung von Speiseölanlagen
1985
·
G. C. Ricci‐Rossi
·
Fette Seifen Anstrichmittel
·
6
Optimization of prefabricated component installation using a real-time evaluator (RTE) connection locating system
2024
·
Nolan W Hayes
, Bryan P Maldonado
, et al.
·
International Symposium on Automation and Robotics in Construction (ISARC)
·
5
PDF
Side Launch of the Lena Guyed Tower Jacket
1984
·
J.K. Flood
, P.O. Pichini
, et al.
·
Offshore Technology Conference
·
5
Development of a Modular Retrofitting System for Residential Buildings and Experience from Pilot Installation
2019
·
P Hejtmánek
, K Sojková
, et al.
·
IOP Conference Series Earth and Environmental Science
·
4
PDF
Analisis Perancangan Alat Khusus Untuk Pemasangan Suspensi Belakang Pada Unit Hd785-7
2018
·
Rasma Rasma
, Hendro Purwono
, et al.
·
SINTEK JURNAL Jurnal Ilmiah Teknik Mesin
·
4
Offshore Wind Turbine Monopile Foundation Installation with a Dynamic Positioned Vessel: A feasibility study by modeling
2018
·
Martijn Wittingen
·
Research Repository (Delft University of Technology)
·
4
PDF
Advancing Electric Submersible Pump Alternative Deployment Technology: An Overview and Case Study
2017
·
Brian A. Roth
, J. J. Xiao
, et al.
·
SPE Annual Technical Conference and Exhibition
·
4
Show more works
View as search
Works count:
224
Citation count:
434
Year
Topic
Type