Product
Help
Pricing
About
Jobs
Log in
Get started
Keyword
Add to collection
line layout
Description:
The arrangement of equipment, workstations, or network connections in a production or infrastructure system.
Primary topic:
Advanced Manufacturing and Logistics Optimization (20%)
Related topics:
Advanced Manufacturing and Logistics Optimization (20%),
Assembly Line Balancing Optimization (18%)
OpenAlex ID:
keywords/line-layout
Design and operational issues in AGV-served manufacturing systems
1998
·
Tharma Ganesharajah
, Nicholas G. Hall
, et al.
·
Annals of Operations Research
·
246
Automatic Metro Map Layout Using Multicriteria Optimization
2010
·
J Stott
, P Rodgers
, et al.
·
IEEE Transactions on Visualization and Computer Graphics
·
115
PDF
Designing mixed-product assembly lines
2000
·
B. Rekiek
, P. De Lit
, et al.
·
IEEE Transactions on Robotics and Automation
·
92
Network Design: An Algorithm for the Access Facility Location Problem
1977
·
P. McGregor
, D. Shen
·
IRE Transactions on Communications Systems
·
85
Improving manual assembly lines devoted to complex electronic devices by applying Lean tools
2018
·
Damásio Correia
, F.J.G. Silva
, et al.
·
Procedia Manufacturing
·
79
Supporting offshoring and nearshoring decisions for mass customization manufacturing processes
2007
·
Stefan Bock
·
European Journal of Operational Research
·
75
Balancing straight and U-shaped assembly lines with resource dependent task times
2011
·
Yakup Kara
, Cemal Özgüven
, et al.
·
International Journal of Production Research
·
63
An integrated approach for product family and assembly system design
2003
·
P. De Lit
, A. Delchambre
, et al.
·
IEEE Transactions on Robotics and Automation
·
62
Balancing parallel assembly lines with disabled workers
2015
·
Felipe F.B. Araújo
, Alysson M. Costa
, et al.
·
European J of Industrial Engineering
·
47
PDF
Balancing assembly lines with industrial and collaborative robots: Current trends and future research directions
2024
·
Masood Fathi
, Arash Sepehri
, et al.
·
Computers & Industrial Engineering
·
44
An Improved Algorithm for the Metro-line Crossing Minimization Problem
2010
·
Martin Nöllenburg
·
Lecture notes in computer science
·
32
On the use of flow dominance in complexity measures for facility layout problems
1985
·
W. HERROELEN
, A. VAN GILS
·
International Journal of Production Research
·
32
PDF
Modeling and Optimization of Parallel Disassembly Line Balancing Problem With Parallel Workstations
2023
·
Wei Liang
, Zeqiang Zhang
, et al.
·
IEEE Transactions on Industrial Informatics
·
26
Оцінювання Ефективності Використання Робочого Часу В Автоматизованих Виробничих Системах Деревообробного Виробництва
2024
·
Роман Оріховський
, Сергій Гайда
·
Forestry Forest Paper and Woodworking Industry
·
22
PDF
A new philosophy for the design of a product and its assembly line
2003
·
P. De Lit
, B. Rekiek
, et al.
·
IEEE International Symposium on Assembly and Task Planning (ISATP)
·
20
An assembly-oriented product family representation for integrated design
2003
·
P. De Lit
, J. Danloy
, et al.
·
IEEE Transactions on Robotics and Automation
·
18
Reduction in setup change time of a machine in a bearing manufacturing plant using SMED and ECRS
2014
·
Gaurav J. Pawar
, Nishant S. Sirdeshpande
, et al.
·
International Journal of Engineering Research
·
14
Extensions du "Hoist scheduling problem" cyclique : résolution basée sur un traitement des contraintes disjonctives en programmation en logique avec contraintes
1996
·
Christophe Varnier
·
12
A review of assembly line balancing and sequencing including line layouts
2008
·
Johan Håkansson
, Emil Skoog
, et al.
·
DiVA (Digitala Vetenskapliga Arkivet)
·
11
Functional entities: A concept to support product family and assembly system design
2002
·
P. De Lit
, T. L'Eglise
, et al.
·
IEEE International Symposium on Assembly and Task Planning (ISATP)
·
11
Total operational efficiency (TOE): the determination of two capacity and cycle time components and their relationship to productivity improvements in a semiconductor manufacturing line
2003
·
D.P. Martin
·
ASMC proceedings
·
10
Analisis Tata Letak Fasilitas Produksi Pada Proses Produksi Mie Telor Ud Sumber Rezeki Di Kota Makassar
2019
·
Asdi Asdi
, Irwan Abdullah
, et al.
·
Jurnal Bisnis dan Kewirausahaan
·
8
Predicting volume distance performance for layout problems with static distance functions
1998
·
C. J. Malmborg
, F.A. Bukhari
, et al.
·
International Journal of Production Research
·
7
Flow complexity—a data suitability index for flowline systems
1983
·
N. A. G. ANEKE
, A. S. CARRIE
·
International Journal of Production Research
·
7
Computer-aided design of bus route maps
2015
·
Yukio Sadahiro
, Takahito Tanabe
, et al.
·
Cartography and Geographic Information Science
·
6
Show more works
View as search
Works count:
118
Citation count:
1,216
Year
Topic
Type