Product
Help
Pricing
About
Jobs
Log in
Get started
Keyword
Add to collection
material quantity estimation
Description:
The calculation or prediction of required material amounts for construction components and projects.
Primary topic:
BIM and Construction Integration (29%)
Related topics:
BIM and Construction Integration (29%),
Construction Project Management and Performance (14%),
Civil and Structural Engineering Research (9%)
OpenAlex ID:
keywords/material-quantity-estimation
How to conduct consistent environmental, economic, and social assessment during the building design process. A BIM-based Life Cycle Sustainability Assessment method
2021
·
B. Soust-Verdaguer
, I. Bernardino Galeana
, et al.
·
Journal of Building Engineering
·
97
PDF
Comparison of embodied energy and environmental impact of alternative materials used in reticulated dome construction
2015
·
Juan C. Salcido
, Adeeba Abdul Raheem
, et al.
·
Building and Environment
·
44
Tactile Beyond Pixels: Multisensory Touch Representations for Robot Manipulation
2025
·
Higuera, Carolina
, Sharma, Akash
, et al.
·
arXiv (Cornell University)
·
43
PDF
BIM-based method calculation of auxiliary materials required in housing construction
2017
·
Haitao Wei
, Shunyi Zheng
, et al.
·
Automation in Construction
·
38
Prediction Model of CO2 Emission for Residential Buildings in South Korea
2014
·
HyunSeok Moon
, ChangTaek Hyun
, et al.
·
Journal of Management in Engineering
·
38
Cost estimation of structural skeleton using an interactive automation algorithm: A conceptual approach
2007
·
Mansour N. Jadid
, Mohammad M. Idrees
·
Automation in Construction
·
37
Application of Artificial Intelligence for the Estimation of Concrete and Reinforcement Consumption in the Construction of Integral Bridges
2020
·
Željka Beljkaš
, Miloš Knežević
, et al.
·
Advances in Civil Engineering
·
19
PDF
Benefit Evaluation of Implementing BIM in Construction Projects
2017
·
Hui-Yu Chou
, Pei-Yu Chen
·
IOP Conference Series Materials Science and Engineering
·
19
PDF
Study of economic viability of 200 MW solar chimney power plant in Rajasthan, India
2014
·
Zainab Akhtar
, K.V.S. Rao
·
International Conference on Non Conventional Energy (ICONCE)
·
19
Early Design Stage Building LCA using The LCAbyg Tool: New Strategies For Bridging The Data Gap
2019
·
K Kanafani
, R Kjær Zimmermann
, et al.
·
IOP Conference Series Earth and Environmental Science
·
18
PDF
Preliminary Cost Estimating for Highway Construction Projects.
1986
·
Kaminsky,Albert F , Jr
·
Defense Technical Information Center (DTIC)
·
17
Analisis Perbandingan Efektifitas Metode Konvensional Dan Bim Pada Elemen Struktur Beton (studi Kasus Gedung Pelayanan Pendidikan Fisip Unsoed)
2022
·
Bagyo Mulyono
, Hafizh Abdullah Zain
, et al.
·
Jurnal Disprotek
·
14
PDF
Analytical Formulation for Early Cost Estimation and Material Consumption of Road Overpass Bridges
2016
·
Dimitrios Konstantinidis
, Fani Antoniou
, et al.
·
Research Journal of Applied Sciences Engineering and Technology
·
14
Practical Software Development: Leveraging AI for Precise Cost Estimation in Lump-Sum EPC Projects
2024
·
Rimma Dzhusupova
, Mina Ya-alimadad
, et al.
·
IEEE International Conference on Software Analysis, Evolution and Reengineering (SANER)
·
13
Material estimation and energy analysis for a domestic building using Revit architecture and insight: a sustainable approach
2024
·
G. T. N. Veerendra
, Subhashish Dey
, et al.
·
Asian Journal of Civil Engineering
·
13
Implementasi Bim Dalam Perhitungan Quantity Take-Off Pekerjaan Struktur Dan Arsitektur Proyek RTCT Pertamina
2023
·
Kania Zahrah
, Lenggogeni
, et al.
·
Jurnal Deformasi
·
12
PDF
Acostestimatemethodforbridge superstructuresusing regression analysisandbootstrap
2010
·
Nikolaos Fragkakis
, Sergios Lambropoulos
, et al.
·
University of Zagreb University Computing Centre (SRCE)
·
12
PDF
Algorithm for filament winding of non-axisymmetric tapered composite components having polygonal cross-section on two-axes filament-winding machine
1994
·
S.K. Mazumdar
, S.V. Hoa
·
Composites Engineering
·
12
Analisis Quantity Take Off Dengan Metode Building Information Modeling Pada Pekerjaan Struktur Gedung Poltekkes Palangka Raya
2024
·
Zakaria Rugas
, Rudi Waluyo
, et al.
·
JURNAL SAINTIS
·
11
Uso de la metodología BRIM (Bridge Information Modeling) como herramienta para la planificación de la construcción de un puente de concreto en Colombia
2014
·
Juan Sebastián Gaitán Cardona
, Adriana Gómez Cabrera
·
Ciencia e Ingeniería Neogranadina
·
11
PDF
A Computer-Aided Conceptual Cost Estimating System for Pre-Stressed Concrete Road Bridges
2014
·
Nikolaos Fragkakis
, Sergios Lambropoulos
, et al.
·
International Journal of Information Technology Project Management
·
9
Comprehensive Analysis of Scheduling Processes in Road Intersections: Associating Deficiencies and Their Consequences in Colombian Projects
2025
·
Karen Castañeda
, Omar Sánchez
, et al.
·
Applied Sciences
·
8
Conceptual Estimation Program Construction Costs and Material Needs
2022
·
Paikun Paikun
·
INTERNATIONAL JOURNAL ENGINEERING AND APPLIED TECHNOLOGY (IJEAT)
·
8
PDF
Kelayakan Perangkat Pembelajaran Dengan Media Animasi Sketchup Pada Perhitungan Volume dan Kebutuhan Bahan Pekerjaan Kolom Di SMKN 1 Mojokerto
2021
·
Siti Badriah
, m.ismail suryanto
·
Jurnal Kajian Pendidikan Teknik Bangunan
·
8
PDF
Estimates of Material Need on Houses Construction Using Regression Model Program
2018
·
Paikun
, Muhammad Kahpi
, et al.
·
IEEE International Conference on Computing, Engineering and Design (ICCED)
·
8
Show more works
View as search
Works count:
520
Citation count:
829
Year
Topic
Type