Product
Help
Pricing
About
Jobs
Log in
Get started
Keyword
Add to collection
part sequencing
Description:
The ordering of parts for processing or assembly in manufacturing systems, often to support scheduling and workflow.
Primary topic:
Scheduling and Optimization Algorithms (64%)
Related topics:
Scheduling and Optimization Algorithms (64%),
Optimization and Packing Problems (7%)
OpenAlex ID:
keywords/part-sequencing
Dynamic instabilities and stabilization methods in distributed real-time scheduling of manufacturing systems
1990
·
P.R. Kumar
, T.I. Seidman
·
IEEE Transactions on Automatic Control
·
379
Sequencing of parts and robot moves in a robotic cell
1992
·
S. P. Sethi
, C. Sriskandarajah
, et al.
·
International Journal of Flexible Manufacturing Systems
·
327
Design, planning, scheduling, and control problems of flexible manufacturing systems
1985
·
K. E. Stecke
·
Annals of Operations Research
·
316
Scheduling in Robotic Cells: Classification, Two and Three Machine Cells
1997
·
Nicholas G. Hall
, Hichem Kamoun
, et al.
·
Operations Research
·
142
Solving machine loading problems in a flexible manufacturing system using a genetic algorithm based heuristic approach
2000
·
M. K. Tiwari
, N.K. Vidyarthi
·
International Journal of Production Research
·
124
A heuristic to minimize makespan of cell scheduling problem
2003
·
M. Solimanpur
, Prem Vrat
, et al.
·
International Journal of Production Economics
·
114
Scheduling no-wait robotic cells with two and three machines
2000
·
A. Agnetis
·
European Journal of Operational Research
·
109
Scheduling in robotic cells: Complexity and steady state analysis
1998
·
Nicholas G. Hall
, Hichem Kamoun
, et al.
·
European Journal of Operational Research
·
100
Scheduling Multiple Parts in a Robotic Cell Served by a Dual-Gripper Robot
2004
·
Chelliah Sriskandarajah
, Inna Drobouchevitch
, et al.
·
Operations Research
·
84
Effectiveness of flexible routing control
1991
·
GraceYuh-Jiun Lin
, JamesJ. Solberg
·
International Journal of Flexible Manufacturing Systems
·
71
Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter
1997
·
H.-K. Roh
, Y.-D. Kim
·
International Journal of Production Research
·
68
Modelling and scheduling of a flexible manufacturing system
1990
·
Tadeusz Sawik
·
European Journal of Operational Research
·
68
Scheduling in Robotic Cells: Heuristics and Cell Design
1999
·
Hichem Kamoun
, Nicholas G. Hall
, et al.
·
Operations Research
·
62
Part sequencing in three-machine no-wait robotic cells
2000
·
A. Agnetis
, D. Pacciarelli
·
Operations Research Letters
·
61
Cutting path optimization in CNC cutting processes using a two-step genetic algorithm
2006
·
Moon-Kyu Lee
, Ki-Bum Kwon
·
International Journal of Production Research
·
60
Sequencing of robot activities and parts in two-machine robotic cells
1996
·
R. LOGENDRAN
, C. SRISKANDARAJAH
·
International Journal of Production Research
·
60
Scheduling large robotic cells without buffers
1998
·
Chelliah Sriskandarajah
, Nicholas G. Hall
, et al.
·
Annals of Operations Research
·
58
Input sequencing and scheduling for a reconfigurable manufacturing system with a limited number of fixtures
2013
·
Jae-Min Yu
, Hyoung-Ho Doh
, et al.
·
The International Journal of Advanced Manufacturing Technology
·
56
Scheduling Parts in a Combined Production-Transportation Work Cell
1990
·
Helman I Stern
, Gad Vitner
·
Journal of the Operational Research Society
·
55
Two-machine robotic cell scheduling problem with sequence-dependent setup times
2012
·
M.H. Fazel Zarandi
, H. Mosadegh
, et al.
·
Computers & Operations Research
·
54
Hybrid flow-shop scheduling with assembly operations
2001
·
Masao Yokoyama
·
International Journal of Production Economics
·
46
Simultaneous optimization of parts and operations sequences in SSMS: a chaos embedded Taguchi particle swarm optimization approach
2008
·
Vishwa Vijay Kumar
, Mayank Kumar Pandey
, et al.
·
Journal of Intelligent Manufacturing
·
43
Heuristic procedures for the parallel machine problem with tool switches
2002
·
Y. Fathi
, K. W. Barnette
·
International Journal of Production Research
·
42
Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times
2003
·
Masao Yokoyama
, Daryl L. Santos
·
European Journal of Operational Research
·
37
A genetic algorithm and memetic algorithm to sequencing and scheduling of cellular manufacturing systems
2008
·
R. Tavakkoli-Moghaddam
, Y. Gholipour-Kanani
, et al.
·
International Journal of Management Science and Engineering Management
·
35
Show more works
View as search
Works count:
157
Citation count:
3,573
Year
Topic
Type