Product
Help
Pricing
About
Jobs
Log in
Get started
Keyword
Add to collection
scrapping
Description:
The disposal of defective or unusable products during manufacturing, removing them from production rather than reworking them.
Related topics:
Supply Chain and Inventory Management (13%),
Reliability and Maintenance Optimization (10%)
Wikidata ID:
wiki/Q9393330
OpenAlex ID:
keywords/scrapping
The influence of modularity and industry clockspeed on reverse logistics strategy: Implications for the purchasing function
2005
·
Isabel Fernández
, Tauno Kekäle
·
Journal of Purchasing and Supply Management
·
106
An integrated model for optimisation of production and quality costs
2010
·
Walid Abdul-Kader
, Ozhand Ganjavi
, et al.
·
International Journal of Production Research
·
59
Learning and investment under demand uncertainty in container shipping
2022
·
Jihye Jeon
·
The RAND Journal of Economics
·
56
Manufacturing to Order with Random Yield and Costly Inspection
2000
·
Abraham Grosfeld-Nir
, Yigal Gerchak
, et al.
·
Operations Research
·
42
Approximate analysis of unreliable transfer lines with splits in the flow of material
2000
·
Stefan Helber
·
Annals of Operations Research
·
40
Like a Good Neighbor, Squatters Are There: Property and Neighborhood Stability in the Context of Urban Decline
2018
·
Claire W. Herbert
·
City and Community
·
38
An absorbing Markov chain model for production systems with rework and scrapping
2008
·
V. Madhusudanan Pillai
, M.P. Chandrasekharan
·
Computers & Industrial Engineering
·
38
Lot sizing with a Markov production process and imperfect items scrapped
2009
·
Bacel Maddah
, Lama Moussawi
, et al.
·
International Journal of Production Economics
·
31
Repetitive Testing Strategies When the Testing Process Is Imperfect
1998
·
Jie Ding
, Betsy S. Greenberg
, et al.
·
Management Science
·
31
Maintenance and investment: Complements or substitutes? A reappraisal
2010
·
R. Boucekkine
, G. Fabbri
, et al.
·
Journal of Economic Dynamics and Control
·
30
PDF
Production control in semiconductor manufacturing with time constraints
2015
·
Rezvan Sadeghi
, Stephane Dauzere-Peres
, et al.
·
ASMC proceedings
·
27
Selection hyperheuristic with knowledge-based Q-learning for dynamic distributed hybrid flow shop scheduling problem considering operation inspection
2025
·
Lin Luo
, Xuesong Yan
·
Swarm and Evolutionary Computation
·
24
Hoarders and ScrappersMadness and the Social Person in the Interstices of the City
2007
·
Anne M. Lovell
·
University of California Press eBooks
·
21
Hybrid flow-shop manufacturing network reliability optimization using genetic algorithm and absorbing Markov chain
2023
·
Cheng-Ta Yeh
, Yi-Kuei Lin
, et al.
·
Applied Mathematical Modelling
·
19
A putty-clay model with three factors of production and partly endogenous technical progress
1985
·
G. M. M. Gelauff
, A. R. M. Wennekers
, et al.
·
De Economist
·
17
Machine Downtime Effect on the Warm-Up Period in an Economic Production Quantity Problem
2023
·
Erfan Nobil
, Leopoldo Eduardo Cárdenas-Barrón
, et al.
·
Mathematics
·
14
PDF
Quality control of an unreliable flexible manufacturing system with scrapping and infinite buffer capacity
1989
·
Lie-Fern Hsu
, CharlesS. Tapiero
·
International Journal of Flexible Manufacturing Systems
·
14
An Approximation To The Stationary Distribution Of A Multidimensional Markov Process
1988
·
S. CHRISTIAN ALBRIGHT
, A. SONI
·
IIE Transactions
·
13
Utilization and maintenance in a model with scrapping
2007
·
George C. Bitros
, Elias Flytzanis
·
European Journal of Operational Research
·
10
Investment, Replacement and Scrapping in a Vintage Capital Model With Embodied Technological Change
2007
·
Georgios (George) C. Bitros
, Natalia Hritonenko
, et al.
·
SSRN Electronic Journal
·
9
Optimal Investment Decisions
2001
·
V. V. Morozov
, A. A. Obizhaeva
, et al.
·
Computational Mathematics and Modeling
·
9
Problems connected with utilization of polymer composite products and waste materials. Part II. "Scrapping” of composite recreational vessels in the world in the perspective of 2030
2019
·
Mieczyslaw Scheibe
, MAGDALENA URBANIAK
, et al.
·
Polimery
·
7
PDF
Transient Analysis of Bernoulli Serial Line with Perishable Products
2015
·
Feng Ju
, Jingshan Li
, et al.
·
IFAC-PapersOnLine
·
7
AMC-Based Algorithm for Network Reliability Evaluation of a Manufacturing System with Scrapping and Rework
2022
·
Chao Yu-Lun
, Lin Yi-Kuei
, et al.
·
International Journal of Performability Engineering
·
6
Absorbing Markov Chain Models to Determine Optimum Process Target Levels in Production Systems with Rework and Scrapping
2010
·
Mohammad Saber Fallah Nezhad
, Seyed Taghi Akhavan Niaki
·
DOAJ (DOAJ: Directory of Open Access Journals)
·
6
Show more works
View as search
Works count:
101
Citation count:
721
Year
Topic
Type