total float
Description:
In project scheduling, the time an activity can be delayed without delaying completion of the overall project.
Primary topic:
Resource-Constrained Project Scheduling (81%)
Related topics:
Resource-Constrained Project Scheduling (81%),
Construction Project Management and Performance (13%)
OpenAlex ID:
keywords/total-float
Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization
2008
·
Ming Lu
, Hoi-Ching Lam
, et al.
·
Automation in Construction
·
117
Total Float Traded as Commodity
1991
·
Jesus M. De La Garza
, Michael C. Vorster
, et al.
·
Journal of Construction Engineering and Management
·
60
Optimizing the Scheduling of Repetitive Construction to Minimize Interruption Cost
2018
·
Ayman Altuwaim
, Khaled El-Rayes
·
Journal of Construction Engineering and Management
·
57
Phantom Float
2003
·
Kyunghwan Kim
, Jesús M. de la Garza
·
Journal of Construction Engineering and Management
·
50
Critical Path Scheduling under Resource Calendar Constraints
2007
·
Ming Lu
, Hoi-Ching Lam
·
Journal of Construction Engineering and Management
·
49
Preallocation of Total Float in the Application of a Critical Path Method Based Construction Contract
2007
·
Jesús M. de la Garza
, Apirath Prateapusanond
, et al.
·
Journal of Construction Engineering and Management
·
46
Effect of resource constraints on float calculations in project networks
1996
·
Tzvi Raz
, Bob Marshall
·
International Journal of Project Management
·
45
Transform Schemes Applied on Non-Finish-to-Start Logical Relationships in Project Network Diagrams
2009
·
Ming Lu
, Hoi-Ching Lam
·
Journal of Construction Engineering and Management
·
37
Least impact algorithm for resource allocation
1993
·
Osama Moselhi
, Pasit Lorterapong
·
Canadian Journal of Civil Engineering
·
31
Generalized Resource-Constrained Critical Path Method to Improve Sustainability in Construction Project Scheduling
2020
·
Kyunghwan Kim
·
Sustainability
·
30
PDF
A Genetic Algorithm with a New Local Search Method for Solving the Multimode Resource-constrained Project Scheduling Problem
2019
·
Mohammad Reza Afshar
, Vahid Shahhosseini
, et al.
·
International Journal of Construction Management
·
27
A Comprehensive Practice of Total Float Pre-Allocation and Management for the Application of A CPM-Based Construction Contract
2003
·
Apirath Prateapusanond
·
VTechWorks (Virginia Tech)
·
25
A New Approach to find Total Float time and Critical Path in a fuzzy Project Network
2010
·
V. Sireesha
, N. Ravi Shankar
·
21
Float analysis of non‐serial repetitive activities
2003
·
Mohammad A. Ammar
·
Construction Management and Economics
·
21
Improvement and application of earned value analysis in coal project management
2011
·
Shuheng Zhong
, Xin Wang
·
Procedia Engineering
·
19
PDF
Formalizing a path-float-based approach to determine and interpret total float in project scheduling analysis
2016
·
Ming Lu
, Jing Liu
, et al.
·
International Journal of Construction Management
·
15
A Framework for Integration Model of Resource-Constrained Scheduling Using Genetic Algorithms
2006
·
Jin-Lee Kim
, R.D. Ellis
·
Winter Simulation Conference
·
14
Analisis penerapan manajemen waktu dengan metode CPM pada proyek pembangunan perumahan griya mahari
2023
·
Syifa Nur Afiya
, Ardana Sultan Alhaq
, et al.
·
JENIUS Jurnal Terapan Teknik Industri
·
13
PDF
An Estimation of the Learning Curve Effect on Project Scheduling with Calendar Days Calculation
2017
·
Levente Mályusz
, Anita Varga
·
Procedia Engineering
·
13
PDF
On the Latest Times and Float Times of Activities in a Fuzzy Project Network with LR Fuzzy Numbers
2012
·
V. Sireesha
, N. Ravi Shankar
, et al.
·
International Journal of Fuzzy System Applications
·
13
Use of float consumption rate in resource leveling of construction projects
2020
·
Atilla Damci
, Gul Polat
, et al.
·
Frontiers of Engineering Management
·
12
Phantom float in commercial scheduling software
2019
·
Diana M. Franco-Duran
, Jesús M. de la Garza
·
Automation in Construction
·
12
An Investigation into the Decision Makers’s Risk Attitude Index Ranking Technique for Fuzzy Critical Path Analysis
2014
·
MH Oladeinde
, CA Oladeinde
·
Nigerian Journal of Technology
·
12
PDF
Minimal and maximal floats in project networks
1985
·
Hans Ziegler
·
Engineering Costs and Production Economics
·
11
Resource-Dependent Critical Path Method for Identifying the Critical Path and the ^|^ldquo;Real Floats^|^rdquo; in Resource-Constrained Project Scheduling
2013
·
Salman Ali NISAR
, Koshi YAMAMOTO
, et al.
·
Journal of Japan Society of Civil Engineers Ser F4 (Construction and Management)
·
10
PDF
Show more works
View as search
Works count:
158
Citation count:
880
Year
Topic
Type