Product
Help
Pricing
About
Jobs
Log in
Get started
Keyword
Add to collection
worker skill levels
Description:
Measures or categories of workers’ abilities and training, considered in manufacturing, scheduling, and workforce assignment.
Related topics:
Assembly Line Balancing Optimization (16%),
Scheduling and Optimization Algorithms (15%),
Construction Project Management and Performance (9%)
OpenAlex ID:
keywords/worker-skill-levels
Factors Affecting Productivity in Green Building Construction Projects: The Case of Singapore
2016
·
Bon-Gang Hwang
, Lei Zhu
, et al.
·
Journal of Management in Engineering
·
214
The Political Economy of U.S. Foreign Direct Investment in Latin America: A Reappraisal
2004
·
John Peter Tuman
, Craig F. Emmert
·
Latin American Research Review
·
163
Quantifying the Invisible Labor in Crowd Work
2021
·
Carlos Toxtli
, Siddharth Suri
, et al.
·
Proceedings of the ACM on Human-Computer Interaction
·
158
PDF
Productivity and ergonomic risk in human based production systems: A job-rotation scheduling model
2015
·
G. Mossa
, F. Boenzi
, et al.
·
International Journal of Production Economics
·
137
Integration of deep reinforcement learning and multi-agent system for dynamic scheduling of re-entrant hybrid flow shop considering worker fatigue and skill levels
2023
·
Youshan Liu
, Jiaxin Fan
, et al.
·
Robotics and Computer-Integrated Manufacturing
·
115
Structural Insulated Panels: Impact on the Residential Construction Process
2006
·
Michael A. Mullens
, Mohammed Arif
·
Journal of Construction Engineering and Management
·
99
PDF
Quality prediction for reconfigurable manufacturing systems via human error modelling
2008
·
W. H. Elmaraghy
, O. A. Nada
, et al.
·
International Journal of Computer Integrated Manufacturing
·
93
Quality Circle Survival: An Exploratory Analysis
1988
·
ROBERT DRAGO
·
Industrial Relations A Journal of Economy and Society
·
92
An efficient multiobjective genetic algorithm for mixed-model assembly line balancing problem considering demand ratio-based cycle time
2009
·
Wenqiang Zhang
, Mitsuo Gen
·
Journal of Intelligent Manufacturing
·
76
Government Effectiveness and Regional Variation in Informal Employment
2012
·
Erik Jonasson
·
The Journal of Development Studies
·
72
Prevalence of HIV in workforces in southern Africa, 2000-2001.
2004
·
Clive Evian
, Matthew Fox
, et al.
·
PubMed
·
57
A combinatorial evolutionary algorithm for unrelated parallel machine scheduling problem with sequence and machine-dependent setup times, limited worker resources and learning effect
2021
·
Like Zhang
, Qianwang Deng
, et al.
·
Expert Systems with Applications
·
56
A study on human-task-related performances in converting conveyor assembly line to cellular manufacturing
2007
·
Ikou Kaku
, Yasuhiko Murase
, et al.
·
European J of Industrial Engineering
·
49
Numerically Controlled Machine Tools and Worker Skills
1991
·
Jeffrey H. Keefe
·
Industrial and Labor Relations Review
·
44
Eliminating price supports
1989
·
Tracy R. Lewis
, Robert Feenstra
, et al.
·
Journal of Public Economics
·
42
Integrating collaboration scenarios and workforce individualization in collaborative assembly line balancing
2024
·
Ali Keshvarparast
, Niloofar Katiraee
, et al.
·
International Journal of Production Economics
·
41
Current status of factors leading to team performance of on-site construction professionals in Alberta building construction projects
2011
·
Kasun N. Hewage
, Anupama Gannoruwa
, et al.
·
Canadian Journal of Civil Engineering
·
41
Labor mobility under asymmetric information with moving and signalling costs
1986
·
Eliakim Katz
, Oded Stark
·
Economics Letters
·
40
Context Matters: The Use of Algorithmic Management Mechanisms in Platform, Hybrid, and Traditional Work Contexts
2023
·
Isabell Lippert
, Kathrin Kirchner
, et al.
·
Hawaii International Conference on System Sciences (HICSS)
·
30
PDF
Cross-trained worker assignment and comparative analysis on throughput of divisional and rotating seru
2018
·
Lang Wu
, Felix T.S. Chan
, et al.
·
Industrial Management & Data Systems
·
29
Bottleneck easing-based assignment of work and product mixture determination: fuzzy assembly line balancing approach
2015
·
Parvaneh Samouei
, Parviz Fattahi
, et al.
·
Applied Mathematical Modelling
·
29
PDF
Dual-resource flexible job shop scheduling considering worker proficiency differences
2025
·
Chuang Wang
, Di Fan
, et al.
·
Computers & Operations Research
·
27
An integrated bi-objective U-shaped assembly line balancing and parts feeding problem: optimization model and exact solution method
2020
·
Ömer Faruk Yılmaz
·
Annals of Mathematics and Artificial Intelligence
·
27
The relationship between workers' experience and productivity: a case study of brick masonry construction
2021
·
Ha Duy Khanh
, Soo-Yong Kim
, et al.
·
International Journal of Construction Management
·
25
A MILP model for an integrated project scheduling and multi-skilled workforce allocation with flexible working hours
2017
·
Ahmed Karam
, El-Awady Attia
, et al.
·
IFAC-PapersOnLine
·
25
Show more works
View as search
Works count:
228
Citation count:
2,400
Year
Topic
Type