Product
Help
Pricing
About
Jobs
Log in
Get started
Source
Add to collection
Research Results
Source type:
journal
Publisher:
Fully OA:
No
DOAJ:
No
OpenAlex ID:
S2764580800
International Concrete Crosstie and Fastening System Survey
2013
·
C Stuart
·
Research Results
·
11
Real-Time Vertical Track Modulus Measurement System from a Moving Railcar
2006
·
Mahmood Fateh
·
Research Results
·
10
Human Reliability Analysis in Support of Risk Assessment for Positive Train Control
2003
·
Thomas Raslear
·
Research Results
·
10
A Comparative Risk Assessment of Remote Control Locomotive Operations versus Conventional Yard Switching Operations
2006
·
Thomas Raslear
, John Conklin
·
Research Results
·
7
Regenerative Power for Track-Health Monitoring
2007
·
Mahmood Fateh
·
Research Results
·
6
Work Schedules and Sleep Patterns of Railroad Signalmen
2005
·
Judith Gertler
, Alex Viale
·
Research Results
·
6
Heavy Axle Load Revenue Service Mud-Fouled Ballast Investigation
2011
·
Luis Maal
, Gary Carr
·
Research Results
·
5
Study of High-Speed Wireless Data Transmissions for Railroad Operation
2007
·
Terry Tse
·
Research Results
·
5
Work Schedules and Sleep Patterns of Railroad Dispatchers
2007
·
Thomas Raslear
·
Research Results
·
5
Non-Destructive Evaluation of Railway Track Using Ground Penetrating Radar
2005
·
Mahmood Fateh
·
Research Results
·
5
A Preliminary Design of a System to Measure Vertical Track Modulus from a Moving Railcar
2004
·
Mahmood Fateh
·
Research Results
·
5
Work Schedules and Sleep Patterns of Railroad Maintenance of Way Workers
2006
·
Thomas Raslear
·
Research Results
·
4
Aerodynamic Effects of High-Speed Trains
2003
·
Thomas C. Tsai
·
Research Results
·
4
Fractal Analysis of Geometry Data for Railroad Track Condition Assessment
2000
·
Mahmood Fateh
·
Research Results
·
4
Effect of Missing or Broken Fasteners on Gage Restraint of Concrete Ties
2011
·
Luis Maal
, Gary Carr
·
Research Results
·
3
Development of an ultra-portable ride quality meter.
2012
·
Leith Al-Nazer
, Robert J Borgovini
·
Research Results
·
2
Performance of Plastic Composite Ties in Revenue Service
2011
·
Rafael Manuel Mérida Jiménez
, Dingqing Li
, et al.
·
Research Results
·
2
Slab Track Test and Demonstration for Shared Freight and High-Speed Passenger Service
2008
·
Donald Plotkin
, Theodore R. Sussmann
·
Research Results
·
2
Safety Analysis of Communication Timeout and Latency in a Positive Train Control System
2008
·
Terry Tse
·
Research Results
·
2
Fracture and Fatigue Damage Tolerance of Bainitic and Pearlitic Rail Steels
2006
·
Mahmood Fateh
·
Research Results
·
2
Computer Model Developed to Predict Rail Passenger Car Response to Track Geometry
2000
·
Magdy El-Sibaie
·
Research Results
·
2
Automated Measurement of Stress in Continuous Welded Rail
2010
·
Mahmood Fateh
·
Research Results
·
1
Alaska Railroad Collision Avoidance System (CAS) Project
2009
·
Terry Tse
·
Research Results
·
1
Development of a Switch Point Monitoring System in Non-Signaled Territory
2007
·
Terry Tse
·
Research Results
·
1
Development of a General Train Movement Simulator for Safety Evaluation
2007
·
Karen McClure
, Terry Tse
·
Research Results
·
1
Show more works
View as search
Works count:
86
Citation count:
112
H-index:
6
I10-index:
3
2yr mean citedness:
Year
Topic
Type