Abstract: Construction of the facility by the constructorInstallation of instruments/equipment and conduct of the test by the tester. 4The controlIed process of performing these activities under quality assurance procedure begins with the preparation of the FWP by the TCO.The process, described in the previous paragraph, in which ihe W plays a central role in the control of activities associated with the field implementation of the test, is intended to provide the ability to respond to changing conditions and proceed with test activities in an expeditious manner.Changes may be necessitated because of a variety of reasons, such as a decision to increase or reduce the scope of the test or encountering geologic conditions different from those anticipated.1 Interfaces associated with the field implementation of the DST are ESF Thermal Test TeamfESF TCO, ESF TCOtESF Designer, and ESF TCOESF Constructor-Operator. I The AVP is the document for tht formal control of these interfaces.There are two ESF Thermal Test related Study Plans under the Site Characterization Plan (SCP, DOE 1988).These arc Study Plan 8.3.1.15.1.6,In Situ ThemomechanicaI Properties; and Study Plan 8.3.4.2.4.4,Engineered Barrier System Field Tests.The plan presented in this document complies with these two study plans and hence with those SCP (DOE 1988) issues germane to thermal testing.Also, the three Site Characterization Analysis open items related to thermal testing (comments 4 and 1 I; question 59) have been addressed both in this report and a complementary report released last year (CRWMS M&O 199Qa). dThis planning document provides much detail on the pertinent technical issues that encompass the DST.The inclusion of this &tail was intentional because of the need to describe the complexities of the DST in a single document.Since this conceptual plan represents a snapshot-in-time of the r 1 status of the DST, it does not include a section dedicated to conclusions or recommendations.
DOI: 10.2172/776512
Author: DOE
Language: English
Subfield: Safety, Risk, Reliability and Quality
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W166346676